Improvement of availability rate of overall equipment effectiveness (OEE) for CNC winding machine / (Record no. 6530)

MARC details
000 -LEADER
fixed length control field 02634ntm a2200277 a 4500
001 - CONTROL NUMBER
control field vtls000094313
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113317.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 160407t2015 my a f 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0005294(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905151033
Level of effort used to assign nonsubject heading access points hanafiah
-- 201604070945
-- huda
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FKP .A36 2015 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Aina Nadia Aida Mohd Latif
245 1# - TITLE STATEMENT
Title Improvement of availability rate of overall equipment effectiveness (OEE) for CNC winding machine /
Statement of responsibility, etc. Aina Nadia Aida Mohd Latif
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2015
300 ## - PHYSICAL DESCRIPTION
Extent xiii, 77 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Manufacturing Engineering
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang – 2015
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography: p. 49-51
520 3# - SUMMARY, ETC.
Summary, etc. Most of manufacturers seek ways to reduce costs that associated with producing and distributing products. In order to reduce the cost, reduction of the losses is needed to improve the efficiency shop floor. High efficiency of machine needed to get higher p rofit in the global competition. A smooth production operation and lower downtime in production shows that the plant is in better management and maintenance. This research is proposed to eliminate waste in setting up CNC winding machine using lean techniques and subsequently improve the availability rate of OEE by reducing set up time. This research has conducted at BI Technologies Corporation production area which is at CNC winding area. By using overall equipment effectiveness as a tool, it is used to evaluate how effectively a manufacturing operation is utilized. The element of OEE which is availability, quality and performance. By propose a solution to company which is toimprove current SOP and using control chart to investigate the OEE data. Ishikawadiagram also apply to show the root cause from investigation the chart from variation. At the end, the control chart used again to indicate the improvement at CNC winding area. The improvement of downtime will lower down the losses of company, and have higher availability with degree of utilization of the resources available. This paper reports the results of this research, including the results of an industrial implementation.
610 2# - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Manufacturing Engineering
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and Colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type Source of classification or shelving scheme
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   FKP .A36 2015 r Bc. 0000108129 04/09/2019 1 04/09/2019 Final Year Report  
  Not lost     UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   CD 8612 | FKP .A36 2015 r Bc. 0000108130 04/09/2019 1 04/09/2019 Final Year Report Library of Congress Classification

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us