Designing a future value stream mapping to reduce lead time in printed circuit board (PCB) manufacturing company / (Record no. 6538)

MARC details
000 -LEADER
fixed length control field 02807ntm a2200277 a 4500
001 - CONTROL NUMBER
control field vtls000094291
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113318.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 160405t2015 my a f 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0005428(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905151510
Level of effort used to assign nonsubject heading access points hanafiah
-- 201604051619
-- huda
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FKP .T48 2015 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Thulasi Manoharan
245 1# - TITLE STATEMENT
Title Designing a future value stream mapping to reduce lead time in printed circuit board (PCB) manufacturing company /
Statement of responsibility, etc. Thulasi Manoharan
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2015
300 ## - PHYSICAL DESCRIPTION
Extent xvii, 66 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Manufacturing Engineering
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang – 2015
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography: p. 57-58
520 3# - SUMMARY, ETC.
Summary, etc. Lean methodology has been used vastly by many manufacturers to improve productivity, produce the right products or services at the right place and meet customer demand on time. In order to survive in today’s competitive and challenging world, manufacturers need to optimize the utilization of lean tools to reduce the manufacturing lead times which can lead to productivity and operating principles improvement. Improvement on the productivity performance becomes the ultimate goal for almost all manufacturing companies nowadays by reducing the production lead time and production waste. The aim of this study is to implement Value Stream mapping technique which is one of the lean tools to improve the productivity in SME Company at the same time reduces the manufacturing lead time and non-value added activities. A current state value stream is mapped to illustrate the material and information flow of PCB production line to analyze value added and non-value added activities. SMT line and Insertion processes are identified as bottleneck processes where the cycle time is higher than the measured takt time which required improvement. As such Line Balancing and Smed lean tools are implemented on both these processes respectively to minimize the cycle time by eliminating the hidden wastes. A future state value stream is then mapped to develop a lean process flow through the elimination of wastes and process improvements. As a conclusion, this paper proves that Value Stream Mapping is an effective tool which can help to identify wasteful activities and processes and serve as an input for continuous improvement by reducing the manufacturing lead time.
610 2# - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Manufacturing Engineering
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and Colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   FKP .T48 2015 r Bc. 0000108153 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   CD 9730 | FKP .T48 2015 r Bc. 0000108154 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us