Reduction of lead time for better delivery of customized cabinet product / (Record no. 6686)

MARC details
000 -LEADER
fixed length control field 03227nam a2200289 a 4500
001 - CONTROL NUMBER
control field vtls000098276
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113323.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 161205t2016 my a f 001 0 eng|d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0000104(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905131132
Level of effort used to assign nonsubject heading access points nazirah
Level of effort used to assign subject headings 201712181618
Level of effort used to assign classification saini
-- 201612051607
-- safura
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FIM .Z83 2016 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Nur Zuadliana Binti Zulkifli
245 10 - TITLE STATEMENT
Title Reduction of lead time for better delivery of customized cabinet product /
Statement of responsibility, etc. Nur Zuadliana Binti Zulkifli
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2016
300 ## - PHYSICAL DESCRIPTION
Extent xiii, 62 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm.+
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Industrial Technology Management
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelor Degree (Hons) of Industrial Technology Management) -- Universiti Malaysia Pahang – 2016
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p.53-54
520 2# - SUMMARY, ETC.
Summary, etc. This study is entitled of reduction of lead time for better delivery of customized cabinet product. This research was conducted in the furniture company in Kuantan and the company is participated in this research to completethis research which is focusing on reduction of lead time for each process. The objective of the research is to identify the elements that contribute on the longer lead time of producing the customized cabinet product, to analyse which strategy that can be implement in the process to reduce the lead time and the last objective is to propose a suggestion of improvement to the process of making customized cabinet. The researcher will identify all the process that involved in the process of producing the customized cabinet in the company and will only focusing on sub process that involved the process of prepare materials, measurements, cutting, patching, making body and glue, finishing and painting and drying. The method that has been used by the researcher in order to complete this study is time study. The researcher observe the time study of each process to record the past lead time of each process in the company and the time study is structured in the table. After that, the researcher identify the causes that contributed on the longer lead time in the process and find out the factors that caused the longer lead time in order to minimizing the lead time and the root cause of each process is structured by using Ishikawa’s diagram or also called as Cause and Effect diagram. The last method is using Failure Mode and Effect Analysis (FMEA) to identify the most critical process that contribute on the longer lead time and to rank the severity (SEV), occurrence (OCC), detection (DET), and RPN.The data is collected by the observation and interviews. In addition, the strategy or suggestion of improvement is structured in the table in chapter 5. The proposals are references from literature from past researchers as a guide and additional information.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Industrial Technology Management
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and Colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/id/eprint/4136">http://ecollib.ump.edu.my/id/eprint/4136</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   FIM .Z83 2016 r Bc. 0000115610 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Final Processing UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 10370 | FIM .Z83 2016 r Bc. 0000115611 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us