Quantification of delay factors using the relative importance index method for construction project / (Record no. 6725)

MARC details
000 -LEADER
fixed length control field 02563ntm a2200289 a 4500
001 - CONTROL NUMBER
control field vtls000098170
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113324.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 161128s2016 my a f abm 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0000412(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905151433
Level of effort used to assign nonsubject heading access points nazirah
Level of effort used to assign subject headings 201712121625
Level of effort used to assign classification fateeha
-- 201611281055
-- saini
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FKASA .F385 2016 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Nor Fatini Mohd Rasip
245 10 - TITLE STATEMENT
Title Quantification of delay factors using the relative importance index method for construction project /
Statement of responsibility, etc. Nor Fatini Mohd Rasip
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2016
300 ## - PHYSICAL DESCRIPTION
Extent xiii, 58 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Civil Engineering and Earth Resources
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2016
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 46-49
520 3# - SUMMARY, ETC.
Summary, etc. Construction known in general as an activity involve of clearing, dredging, excavating and grading of land and other activity associate with building, structure and other types of structure such as bridges, dams and roads. In the real situation, every project of construction will face a delay. Delay commonly happen in large project as it involved many parties. As a result, many major projects fail to meet schedule deadlines. The aim of this research is to identify the delay factors of construction projects on view of contractor and analyze these factors with the Relative Importance Index Method. For this purpose, 25 different delay factor were identify and categories in 5 major factor. The main major factor is contractor related factor, consultant related factor, design related factor, equipment related factor and external related factor. The Relative Importance Index (RII) is calculate for each factor and ranking it from the highest value to the lower value. The highest value of Relative Importance Index (RII) is known as a major factor of delay in construction project. Some of the recommendation and suggestion from the respondent are contractors should have experience before the bidding stage. Plus, project manager should preparing effective planning and scheduling to make sure the progress run smoothly.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Civil Engineering and Earth Resources
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and Colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/id/eprint/4038">http://ecollib.ump.edu.my/id/eprint/4038</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   In Transit UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   FKASA .F385 2016 r Bc. 0000115045 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   In Transit UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 10297 | FKASA .F385 2016 r Bc. 0000115046 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us