Risk management in construction industry / (Record no. 6742)

MARC details
000 -LEADER
fixed length control field 02669ntm a2200289 a 4500
001 - CONTROL NUMBER
control field vtls000099301
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113325.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 170420t2017 my a f a m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0000403(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905151425
Level of effort used to assign nonsubject heading access points nazirah
Level of effort used to assign subject headings 201712061147
Level of effort used to assign classification huda
-- 201704201613
-- fateeha
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FKASA .F38 2017 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Fatin Izzati Sulaiman
245 10 - TITLE STATEMENT
Title Risk management in construction industry /
Statement of responsibility, etc. Fatin Izzati Sulaiman
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2017
300 ## - PHYSICAL DESCRIPTION
Extent xiii, 40 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Civil Engineering and Earth Resources
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelors of Civil Engineering (Hons.)) -- Universiti Malaysia Pahang – 2017
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 35-36
520 3# - SUMMARY, ETC.
Summary, etc. Managing risk during construction period is very important process in order to achieve the project objective in terms of safety and health, cost, time and quality. Four elements in managing the risk effectively are begun by establishing organizational structure, process and resources to enhance its performance. Therefore, this study is carried out to identify the risk that always occur in construction industry and also to determine the factor of risk in order to carried out the solution to prevent risk from occur. The study involved the G7 contractors registered with CIDB that have been involved in project area of Kuala Lumpur and also Kuantan. The total of 130 questionnaires was distributed and only 109 were returned answered which give a value of 84%. From the study, the risks that always occur in construction are machine and equipment problem and also manpower resources problem. Factor that contributes to the risk in construction industry are lack of site safety inspection and supervision, lack of adequate tool and equipment, lack of safety knowledge, lack of adequate lighting and also lack of compliance to governmental safety regulation. In order to minimize the risk and also to prevent the risk from occur, well planning of project process before project start should be done firstly follow by well manage machinery and equipment, established an efficient communication at the work place, assign a risk engineer and also develop the risk management workshop for employees.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Civil Engineering and Earth Resources
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and Colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/25853/">http://ecollib.ump.edu.my/25853/</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   FKASA .F38 2017 r Bc. 0000117451 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 10630 | FKASA .F38 2017 r Bc. 0000117452 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us