MARC details
| 000 -LEADER |
| fixed length control field |
02233nam a2200289 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000098306 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113329.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
161206t2016 my a f 001 0 eng|d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0000075(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905131255 |
| Level of effort used to assign nonsubject heading access points |
aishah |
| Level of effort used to assign subject headings |
201712061248 |
| Level of effort used to assign classification |
nazri |
| -- |
201612061526 |
| -- |
safura |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
FIM .N67 2016 r Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Siti Nor Bt Azahari |
| 245 14 - TITLE STATEMENT |
| Title |
The problem of resource planning in construction project in Kuantan/ |
| Statement of responsibility, etc. |
Siti Nor Bt Azahari |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2016 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
ix, 54 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm.+ |
| Accompanying material |
1 CD-ROM |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Industrial Management |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project Paper (Bachelor Degree of Project Management) -- Universiti Malaysia Pahang – 2016 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p.40-42 |
| 520 2# - SUMMARY, ETC. |
| Summary, etc. |
This research was conducted to identify the problem of resource planning in construction project. Besides that, the objective for this research was to rank the most frequent problem that occur during resource planning in construction project. This objective to ensure that the project manager, engineer and others to be prepared and find the alternative to reduce this problem. In this research, the method that used for obtaining survey research was questionnaire for collecting the response from the project manager, engineer and others. The total respondents for this research were 32 from building construction company that categorized in G6 and located in Kuantan, Pahang. Next, Statistical Package for the Social Science (SPSS) was used in analysing these research finding. The result for this research showed that the problem of material planning in construction project was the highest value of the mean. Lastly, the main suggested recommendation for this research is to increase the number of respondent and number of questionnaire in order to obtain more accurate data. |
| 610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME |
| Corporate name or jurisdiction name as entry element |
Faculty of Industrial Management |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Universities and Colleges |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Theses |
| 856 40 - ELECTRONIC LOCATION AND ACCESS |
| Uniform Resource Identifier |
<a href="http://ecollib.ump.edu.my/4151/">http://ecollib.ump.edu.my/4151/</a> |
| Public note |
Access in library only |