The impact of benchmarking approach towards Performance in construction industry / (Record no. 6886)

MARC details
000 -LEADER
fixed length control field 02565nam a2200289 a 4500
001 - CONTROL NUMBER
control field vtls000098298
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113330.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 161206t2015 my a f 001 0 eng|d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0000098(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905131330
Level of effort used to assign nonsubject heading access points aishah
Level of effort used to assign subject headings 201712061559
Level of effort used to assign classification nazri
Level of effort used to assign subject headings 201612061438
Level of effort used to assign classification safura
-- 201612061206
-- safura
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FIM .U43 2015 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Umairah ‘Aqilah Binti Sudin
245 14 - TITLE STATEMENT
Title The impact of benchmarking approach towards Performance in construction industry /
Statement of responsibility, etc. Umairah ‘Aqilah Binti Sudin
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2015
300 ## - PHYSICAL DESCRIPTION
Extent xiv, 65 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm.+
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Industrial Management
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelor Degree in Project Management with Honors) -- Universiti Malaysia Pahang – 2015
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p.59-60
520 2# - SUMMARY, ETC.
Summary, etc. The benchmarking approach is important for each industry, mostly industry that used this tool is construction, hotel management, and food and beverage industry. This study is to identify the factor of benchmarking that influence performance improvement in construction industry and to rank the impact of using benchmarking tool for construction industry. Both of the objectives have huge influence to ensure a success of the project. Therefore, factor of benchmarking also give an impact towards performance of the company. Unimportant factor that used when benchmarking an industry will bring nothing benefits for the organization. The population of this study is 75 employees from executive positions that work in construction companies at Kuantan, Pahang Darul Makmur. The sample size is use as the units of analysis, 63 employees which were from executive position was selected. In conducting this study, random sampling survey method was being used and this questionnaires survey was distributed to respondent by email (Google doc). For data analyzing, this data was carried out by using Descriptive statistic is drawn from Statistical Package Social Science (SPSS) outputs. The finding from this study indicate that the factor of benchmarking have an impact towards performance in construction industry whether improve or become worst.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Industrial Management
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and Colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/25583/">http://ecollib.ump.edu.my/25583/</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   In Transit UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   FIM .U43 2015 r Bc. 0000115590 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Final Processing UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 10360 | FIM .U43 2015 r Bc. 0000115591 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us