Simulation-based scheduling system at R2 Print Enterprise Kuantan (Record no. 6901)

MARC details
000 -LEADER
fixed length control field 03489nmm a2200313 a 4500
001 - CONTROL NUMBER
control field vtls000098444
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113331.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 161214s2016 my fq d 001 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0005114(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905131515
Level of effort used to assign nonsubject heading access points hanafiah
Level of effort used to assign subject headings 201712261158
Level of effort used to assign classification nazri
-- 201612141028
-- saini
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FKP .A855 2016 r Bc.
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) CD 10445
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Atikah Selamat
245 10 - TITLE STATEMENT
Title Simulation-based scheduling system at R2 Print Enterprise Kuantan
Medium [electronic resource] /
Statement of responsibility, etc. Atikah Selamat
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2016
300 ## - PHYSICAL DESCRIPTION
Extent 1 computer disc :
Other physical details digital data ;
Dimensions 12 cm.
500 ## - GENERAL NOTE
General note Faculty of Manufacturing Engineering
500 ## - GENERAL NOTE
General note Theses Gred A
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelor of Engineering in Manufacturing Engineering (Hons.)) -- Universiti Malaysia Pahang – 2016
520 3# - SUMMARY, ETC.
Summary, etc. This thesis deals with decision support tool for dynamic job shop scheduling at R2 Print Enterprise, Kuantan. The objective of this thesis is to understand the job shop production in dynamic environment, to develop scheduling system based on real-time data and to implement it in R2 Print Enterprise. The thesis describes the scheduling techniques with aim to delivering jobs on time and can adapt to the rush orders. Here, a printing company with two different jobs are modelled in Arena Simulation Software to study the suitable scheduling heuristic rules to be implemented to the problems. The main heuristic rules studied in this thesis are First In First Out (FIFO), Earliest Due Date (EDD), Shortest Processing Time (SPT) and Longest Processing Time (LPT). The performance measures taken in this research are the Total Average Time Delays, Total Average Product Delays, Total Product Flow Times and the Resource Utilizations. The Large Format Product (LFP) job considered n = 6 products and m = 4 work centers (6x4) while the Paper Product (PP) job considered n = 7 products and m = 3 work centers (7x3). The product sequence and processing time are dependent on each other. The sequence length can vary from three to four operations and there is no flexibility on the sequence. The model is run for 5 days with 9 hours operation time per day. The obtained results indicate that in LFP job, there is no single rule which dominates the others although EDD seems to be more effective than other rules.The summarized results show that the best scheduling rules for Total Time Delays is SPT, for Total Product Delays is EDD, for Total Flow Times is EDD the best scheduling rules for Resource Utilization is SPT. In PP job, there is also no dominant single rule that clearly dominant although the most successing rules are those with short processing times. The summarized results indicate that the best scheduling rules for Total Time Delays is EDD. For Total Product Delays are FIFO and EDD, for Total Flow Times is SPT and for Resource Utilization, the best scheduling rule is SPT, FIFO, LPT and EDD as they give equal results. The results can significantly reduce the time to produce and reduce the delay in delivering jobs.
538 ## - SYSTEM DETAILS NOTE
System details note Item in PDF format
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Manufacturing Engineering
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and Colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/id/eprint/4045">http://ecollib.ump.edu.my/id/eprint/4045</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   FKP .A855 2016 r Bc. | CD 10445 0000115960 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us