Tendering and estimating strategies In contractor organization / (Record no. 6926)

MARC details
000 -LEADER
fixed length control field 02544ntm a2200289 a 4500
001 - CONTROL NUMBER
control field vtls000099429
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113331.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 170425t2017 my a f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0000525(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905151608
Level of effort used to assign nonsubject heading access points nazirah
Level of effort used to assign subject headings 201712061158
Level of effort used to assign classification huda
-- 201704251157
-- nazri
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FKASA .L53 2017 r Bc.
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Liana Syafawati Mohamad Azmi
245 10 - TITLE STATEMENT
Title Tendering and estimating strategies In contractor organization /
Statement of responsibility, etc. Liana Syafawati Mohamad Azmi
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2017
300 ## - PHYSICAL DESCRIPTION
Extent xiii, 53 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Civil Engineering and Earth Resources
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2017
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 47-49
520 3# - SUMMARY, ETC.
Summary, etc. The contractors’ survival in the construction industry depends on number of projects they operate. If the contractors fail to secure and win the project, the company will not be able to survive in a long time. But to remain survived, the contractors have to compete to other registered contractors. The competitions among them are stiff. Therefore, this study is carried out to identify factors to improve tendering and estimating efficiency also to propose a sustainable method to win bid in tendering. The study involved the G7 contractors registered with CIDB that have been involved in project related to Public Work Department (PWD) tender in area of Kuala Lumpur. The total of 120 questionnaires was distributed and only 103 were returned answered which give a value of 86%. From the study, the factors to improve the tendering and estimating efficiency are skill and experience of estimator, and skill and experience of the purchasers and evaluate previous bidding performance, evaluation on previous bidding performance, monitoring on submitting tender and size of the project. For the factors to propose a sustainable method to win bid in tendering are contractors own plants or subsidiary companies, maintain a lower and effective opening cost, and minimize overhead cost by maintain on the required numbers, quality of staff needed.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Civil Engineering and Earth Resources
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and Colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/25709/">http://ecollib.ump.edu.my/25709/</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   FKASA .L53 2017 r Bc. 0000117467 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 10638 | FKASA .L53 2017 r Bc. 0000117468 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us