MARC details
| 000 -LEADER |
| fixed length control field |
03467ntm a2200289 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000098291 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113333.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
161206s2015 my da f abm 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0000068(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905131248 |
| Level of effort used to assign nonsubject heading access points |
aishah |
| Level of effort used to assign subject headings |
201712061226 |
| Level of effort used to assign classification |
nazri |
| Level of effort used to assign subject headings |
201612061326 |
| Level of effort used to assign classification |
saini |
| Level of effort used to assign subject headings |
201612061314 |
| Level of effort used to assign classification |
saini |
| -- |
201612061106 |
| -- |
saini |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
FIM .N33 2015 r Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Nadia Izaty Baharuddin |
| 245 10 - TITLE STATEMENT |
| Title |
Communication tools and issues among the construction project team / |
| Statement of responsibility, etc. |
Nadia Izaty Baharuddin |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2015 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xiii, 75 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Industrial Technology Management |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project Paper (Bachelor Degree (Hons) of Project Management) -- Universiti Malaysia Pahang – 2015 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 67-71 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Communication is crucial and it gives significant influence to the outcome of the construction project whether it may be success or a failure. In the construction project, various parties involved and one of them known as project team. The objectives of this study are to identify the communication tools commonly used among the construction project team and to analyze the issues commonly arise from each communication tool used during their involvement in the project. To gather the information for this study, the researcher used two (2) types of data collection methods which are primary data sources and secondary data sources. For primary data sources, the researcher applied quantitative method which is questionnaire. This questionnaire was designed as a close-ended question and it was circulated to the respondents via email and by hand method. Meanwhile, for secondary data sources, the researcher consume literature review from published printed sources such as journals, articles and books as well as published electronic sources. The researcher use stratified random sampling type disproportionate as a sampling technique because the researcher conducted the study in four (4) group and the number of respondents are different for each group. The population of this study is 260 respondents and the sample size is 140. Respondents for this study is contractor G7, architect, civil engineer and quantity surveyor at Kedah. Results obtained from data analysis shows that most of the respondents always used telephone (either mobile phone/direct line) as a tool to communicate between them while managing a project. Using facsimiles is the lowest ranking among all the tools. The finding also shows that issue from facsimiles tool which is impractical to send lots of documents have the highest ranking among all the issues. As a conclusion, the construction project team must know suitable tool to deliver the information because from past research shows that communication is one of the factor or causes that lead to the project success or failure. For further study, the researcher hopes a research can be done to analyze on the other various tools that commonly use since the technology has evolved so much these days. |
| 610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME |
| Corporate name or jurisdiction name as entry element |
Faculty of Industrial Technology Management |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Universities and Colleges |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Theses |
| 856 40 - ELECTRONIC LOCATION AND ACCESS |
| Uniform Resource Identifier |
<a href="http://ecollib.ump.edu.my/4164/">http://ecollib.ump.edu.my/4164/</a> |
| Public note |
Access in library only |