Building information modeling : (Record no. 6994)

MARC details
000 -LEADER
fixed length control field 02871ntm a2200289 a 4500
001 - CONTROL NUMBER
control field vtls000098152
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113334.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 161124s2016 my a f abm 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0000253(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905141526
Level of effort used to assign nonsubject heading access points nazirah
Level of effort used to assign subject headings 201712150946
Level of effort used to assign classification fateeha
-- 201611241156
-- saini
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FKASA .A37 2016 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Siti Aisyah Fathol Karib
245 10 - TITLE STATEMENT
Title Building information modeling :
Remainder of title 4D modeling /
Statement of responsibility, etc. Siti Aisyah Fathol Karib
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2016
300 ## - PHYSICAL DESCRIPTION
Extent xiv, 79 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Civil Engineering and Earth Resources
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2016
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 73-75
520 3# - SUMMARY, ETC.
Summary, etc. As time passes, we can seen growing interest from the design and construction community to adopt 3D and 4D modelling tools associated inorder to fulfill demand of construction industry which requires a highly accurate planning, scheduling and management of the process which can enable the overall optimization of the cost,time and resources.In traditional practice that used AutoCAD drawings, MS Project and Primavera for scheduling taking a lot of strain and it is difficult to explain status of the project to the client and time consuming. Construction sequence planning as one of the key processes in a construction project can benefit from model based working. The research were correlated to each other and they are literature review, data collection, develop BIM modelling and 4D modelling and finally data analysis technique which used content analysis.Literature review was conducted to form knowledge of the current issues in the construction industry and subsequently to identify research problem and form research objectives.While data collection is the first step inorder to create 4D model.Hence,data need to collect in form of completed 2D drawings and redraw it in 3D modelling software.Next create the model in 3D and 4D model.This case study describes different approaches for assembling a project team to leverage these technologies, the modelling requirements for implementing 3D and 4D projects, the 3D and 4D modelling processes and the significant benefits of the process and technologies. Last but not least,the finding from this research is produce 3D and 4D modelling, produce the critical path method (CPM) and collect the correct data for creating the model.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Civil Engineering and Earth Resources
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and Colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/id/eprint/25741">http://ecollib.ump.edu.my/id/eprint/25741</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   In Transit UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   FKASA .A37 2016 r Bc. 0000115005 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 10226 | FKASA .A37 2016 r Bc. 0000115006 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us