MARC details
| 000 -LEADER |
| fixed length control field |
02871ntm a2200289 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000098152 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113334.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
161124s2016 my a f abm 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0000253(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905141526 |
| Level of effort used to assign nonsubject heading access points |
nazirah |
| Level of effort used to assign subject headings |
201712150946 |
| Level of effort used to assign classification |
fateeha |
| -- |
201611241156 |
| -- |
saini |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
FKASA .A37 2016 r Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Siti Aisyah Fathol Karib |
| 245 10 - TITLE STATEMENT |
| Title |
Building information modeling : |
| Remainder of title |
4D modeling / |
| Statement of responsibility, etc. |
Siti Aisyah Fathol Karib |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2016 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xiv, 79 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Civil Engineering and Earth Resources |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2016 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 73-75 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
As time passes, we can seen growing interest from the design and construction community to adopt 3D and 4D modelling tools associated inorder to fulfill demand of construction industry which requires a highly accurate planning, scheduling and management of the process which can enable the overall optimization of the cost,time and resources.In traditional practice that used AutoCAD drawings, MS Project and Primavera for scheduling taking a lot of strain and it is difficult to explain status of the project to the client and time consuming. Construction sequence planning as one of the key processes in a construction project can benefit from model based working. The research were correlated to each other and they are literature review, data collection, develop BIM modelling and 4D modelling and finally data analysis technique which used content analysis.Literature review was conducted to form knowledge of the current issues in the construction industry and subsequently to identify research problem and form research objectives.While data collection is the first step inorder to create 4D model.Hence,data need to collect in form of completed 2D drawings and redraw it in 3D modelling software.Next create the model in 3D and 4D model.This case study describes different approaches for assembling a project team to leverage these technologies, the modelling requirements for implementing 3D and 4D projects, the 3D and 4D modelling processes and the significant benefits of the process and technologies. Last but not least,the finding from this research is produce 3D and 4D modelling, produce the critical path method (CPM) and collect the correct data for creating the model. |
| 610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME |
| Corporate name or jurisdiction name as entry element |
Faculty of Civil Engineering and Earth Resources |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Universities and Colleges |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Theses |
| 856 40 - ELECTRONIC LOCATION AND ACCESS |
| Uniform Resource Identifier |
<a href="http://ecollib.ump.edu.my/id/eprint/25741">http://ecollib.ump.edu.my/id/eprint/25741</a> |
| Public note |
Access in library only |