Relationship between total quality management (TQM) practises and operational performance in manufacturing company / (Record no. 7040)

MARC details
000 -LEADER
fixed length control field 02430ntm a2200289 a 4500
001 - CONTROL NUMBER
control field vtls000098262
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113335.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 161205t2016 my a f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0000020(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905131021
Level of effort used to assign nonsubject heading access points aishah
Level of effort used to assign subject headings 201712181616
Level of effort used to assign classification saini
-- 201612051149
-- fateeha
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FIM .A55 2016 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Nur Anis Buniamin
245 10 - TITLE STATEMENT
Title Relationship between total quality management (TQM) practises and operational performance in manufacturing company /
Statement of responsibility, etc. Nur Anis Buniamin
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2016
300 ## - PHYSICAL DESCRIPTION
Extent xiii, 69 p. :
Other physical details ill. ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Industrial Management
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Industrial Technology Management with Honours) -- Universiti Malaysia Pahang - 2016
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 48-52
520 3# - SUMMARY, ETC.
Summary, etc. Total quality management (TQM) practises are well known approaches that most of the overseas company used. But in Malaysian company, this approach is not so often used. Other than that, not many researchers do the research about the effect of TQM practises on operational performance. So the aims of this research are to identify the levels of TQM practises (leadership, customer focus, management of people, process improvement, strategic planning and use of information and analysis) for operational performance and to determine the effect of TQM practises on operational performance. The indicators of operational performance are productivity, quality and waste level. The collected data was analysed by using descriptive statistic, reliability, normality, Pearson Correlation, single mean t-test and regression analysis. As a result, only strategic planning and process improvement practises positively contribute to operational performance. For future researcher, they should do more research about operational performance like increase the numbers of indicators for operational performance. Therefore, they can give more comprehensive understanding to colleagues and students about operational performance.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Industrial Management
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and Colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/id/eprint/4137">http://ecollib.ump.edu.my/id/eprint/4137</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   In Transit UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   FIM .A55 2016 r Bc. 0000115628 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   In Transit UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 10379 | FIM .A55 2016 r Bc. 0000115629 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us