A study of integration of risk management and value management in construction project / (Record no. 7123)

MARC details
000 -LEADER
fixed length control field 02467ntm a2200289 a 4500
001 - CONTROL NUMBER
control field vtls000098315
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113338.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 161207s2015 my da f abm 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0000060(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905131239
Level of effort used to assign nonsubject heading access points aishah
Level of effort used to assign subject headings 201712051541
Level of effort used to assign classification nazri
-- 201612071109
-- saini
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FIM .L447 2015 r Bc.
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Lee, Swet Jean
245 12 - TITLE STATEMENT
Title A study of integration of risk management and value management in construction project /
Statement of responsibility, etc. Lee Swet Jean
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2015
300 ## - PHYSICAL DESCRIPTION
Extent [v], 56 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Industrial Management
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelor Degree (Hons) of Project Management) -- Universiti Malaysia Pahang – 2015
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 46-48
520 3# - SUMMARY, ETC.
Summary, etc. Contruction industry is one the main contributors for the growth of economic in Malaysia. Meanwhile, the process of construction project involves high risk and full of uncertainties. The issues that always happen are delay, over budget, out of scope and fail to achieve the objective. Risk management and value management are the best practice management tools to reduce the probability of risk and balance the cost and value of the construction project respectively. However, applying both of the management practices separately is waste of time and resources. Therefore, this research was conducted to identify the potentiality of the integration between risk management and value management and determine the benefits of the integration to the construction projects. The data was collected from targeted respondents who working at G7 construction company at Selangor. The data was analyzed by using SPSS 2.0 software. Pearson Correlation Test was used to analyze the relationship between the similarity factors and the potentiality of the risk management and value management to be integrated. Descriptive analysis used to identify the most significant benefits to the construction project. The results and findings provide the idea of the integration of both processes to project managers.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Industrial Management
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and Colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/25624/">http://ecollib.ump.edu.my/25624/</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   In Transit UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   FIM .L447 2015 r Bc. 0000115556 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   In Transit UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 10341 | FIM .L447 2015 r Bc. 0000115557 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us