Application of planning software in construction industries : (Record no. 7127)

MARC details
000 -LEADER
fixed length control field 03154ntm a2200289 a 4500
001 - CONTROL NUMBER
control field vtls000098212
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113338.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 161130t2016 my a f 0 0 00eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0000250(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905141524
Level of effort used to assign nonsubject heading access points nazirah
Level of effort used to assign subject headings 201712261138
Level of effort used to assign classification nazri
Level of effort used to assign subject headings 201612011103
Level of effort used to assign classification zul
-- 201611301149
-- zul
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FKASA .A367 2016 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Ain Rashida Abdullah
245 10 - TITLE STATEMENT
Title Application of planning software in construction industries :
Remainder of title study on effectiveness of planning software toward project planning /
Statement of responsibility, etc. Ain Rashida binti Abdullah
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2016
300 ## - PHYSICAL DESCRIPTION
Extent xi, 69 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD ROM
500 ## - GENERAL NOTE
General note Faculty of Civil Engineering and Earth Resources
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2016
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 43- 44
520 3# - SUMMARY, ETC.
Summary, etc. The construction industry is significant in the development of the Malaysian economy towards fully developed nation. To implement construction project, a proper planning and scheduling is of vital important in order for the project to be executed and run smoothly. The best schedule is not the schedule showing the project completed in the shortest time period, it is the schedule that meets the primary objectives of the total project. Those primary objectives are to create a quality project, completed on time, within budget, and in a safe work environment. Therefore, this is focus on research to study on effectiveness of planning software. To achieve the aimed of this study, the following objectives has been identified such as to study the scheduling technique used in developing planning and scheduling, to identify the factors that cause the importance of using planning software for contractors nowadays and to analyses level of the effectiveness of using planning software in delivering construction projects. This study involved contractor who have project in the area of peninsular Malaysia. This study is carried out by questionnaires. A total of 50 questionnaires were distributed and only 46 questionnaires were returned was answered. This study was found that type of constructions that most involved in planning and scheduling software in building construction. The technique that the most used in schedule and cost planning and control was using software for schedule management. The main factor of using planning software was to get budget and work time for each activity and aimed to achieving an effective project planning. Planning and scheduling software more effectiveness because of it would be easily to share information and stay up-to-date with project changes and also time saving of construction work can be improve from software planning.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Civil Engineering and Earth Resources
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and Colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/id/eprint/3948">http://ecollib.ump.edu.my/id/eprint/3948</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   In Transit UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   FKASA .A367 2016 r Bc. 0000114907 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   In Transit UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD10178 | FKASA .A367 2016 r Bc. 0000114908 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us