The failure factors of implementing tqm at construction organization at Kuantan / (Record no. 7136)

MARC details
000 -LEADER
fixed length control field 02399ntm a2200289 a 4500
001 - CONTROL NUMBER
control field vtls000098328
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113339.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 161207s2016 my da f abm 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0000077(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905131309
Level of effort used to assign nonsubject heading access points aishah
Level of effort used to assign subject headings 201712141229
Level of effort used to assign classification nazri
-- 201612071457
-- saini
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FIM .N673 2016 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Mohd Nordin Zainol
245 14 - TITLE STATEMENT
Title The failure factors of implementing tqm at construction organization at Kuantan /
Statement of responsibility, etc. Mohd Nordin Zainol
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2016
300 ## - PHYSICAL DESCRIPTION
Extent xi, 56 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Industrial Management
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelor Degree (Hons) of Project Management) -- Universiti Malaysia Pahang – 2016
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. [45]-47
520 3# - SUMMARY, ETC.
Summary, etc. Total quality management (TQM) is a systematic and comprehensive approach in organizational management. The aim of TQM is to improve the current quality of products and services in organization production. Successful implementing TQM can improve a company profitability and also can achieve customer satisfaction. TQM always famous at manufacturing industries and not more familiar in construction organization. Implemented TQM in construction organizations are not necessarily successful on the whole activities. This may be caused by poor management in the implementation of these activities. This research was identified the factors that contribute to failure. For this study quantitative research has been use to collect the data. There are 77 respondents from Construction organization G6 and G7 are involve in this research. This research aim to identify the failure factor and effect the organization performance. SPSS as a tool that use to analyse the data from respondents answered. From the result, Poor management in communication is a main failure factor in implementing TQM. Besides that, all the failure factors was effected the construction organization performance in term of scope, cost and time.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Industrial Management
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and Colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href=" http://ecollib.ump.edu.my/id/eprint/3930"> http://ecollib.ump.edu.my/id/eprint/3930</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   In Transit UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   FIM .N673 2016 r Bc. 0000115530 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 10328 | FIM .N673 2016 r Bc. 0000115531 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us