Acceptance of an innovation toward performance within construction industry / (Record no. 7304)

MARC details
000 -LEADER
fixed length control field 02340ntm a2200289 a 4500
001 - CONTROL NUMBER
control field vtls000098319
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113345.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 161207s2015 my da f abm 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0000011(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905101540
Level of effort used to assign nonsubject heading access points aishah
Level of effort used to assign subject headings 201712051245
Level of effort used to assign classification nazri
-- 201612071131
-- saini
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FIM .A36 2015 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Ainaa Farhana Rosli
245 10 - TITLE STATEMENT
Title Acceptance of an innovation toward performance within construction industry /
Statement of responsibility, etc. Ainaa Farhana Rosli
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2015
300 ## - PHYSICAL DESCRIPTION
Extent xiv, 79 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Industrial Management
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelor Degree (Hons) of Project Management) -- Universiti Malaysia Pahang – 2015
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 70-73
520 3# - SUMMARY, ETC.
Summary, etc. This study is to determine acceptance an innovation towards performance in Construction Company and identify an obstacle on acceptance an innovation towards Construction Company. Both of the objectives have huge influence to construction industry. Therefore, acceptance innovation give an impacts towards the construction industry/company. The obstacles can affected the construction industry difficult to accept new technology. The population of this study is 75 of selected contractor under Grade 7 registered with Construction Industry Development Board of Malaysia (CIDB) at Kuantan, Pahang Darul Makmur. The sample size is use as the units of analysis, 63 selected contractors which were from executive position was selected. In conducting this study, random sampling survey method was being used and this questionnaires survey was distributed to respondent by email and face to face. For the data analysing, this data was carried out by using Descriptive statistic is drawn from Statistical Package Social Science (SPSS) outputs. The finding from this study shows that an obstacles cause the construction industry/company towards acceptance an innovation itself.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Industrial Management
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and Colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/4161/">http://ecollib.ump.edu.my/4161/</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   In Transit UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   FIM .A36 2015 r Bc. 0000115562 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 10345 | FIM .A36 2015 r Bc. 0000115563 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us