MARC details
| 000 -LEADER |
| fixed length control field |
03792ntm a2200373 i 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000103161 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113357.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
180326s2018 my da f am 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0000683(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905170952 |
| Level of effort used to assign nonsubject heading access points |
nazirah |
| -- |
201803260934 |
| -- |
saini |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| Language of cataloging |
eng |
| Transcribing agency |
UMP |
| Description conventions |
rda |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
FKASA .S53 2018 r Thesis |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Shaiful Azman Taha, |
| Relator term |
author. |
| 245 10 - TITLE STATEMENT |
| Title |
Developing safety and health assessment model as benchmark strategy to evaluate and measure the performance of contractor in JKR construction project / |
| Statement of responsibility, etc. |
Shaiful Azman Taha |
| 264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE |
| Place of production, publication, distribution, manufacture |
Kuantan, Pahang : |
| Name of producer, publisher, distributor, manufacturer |
UMP, |
| Date of production, publication, distribution, manufacture, or copyright notice |
2018 |
| 264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE |
| Date of production, publication, distribution, manufacture, or copyright notice |
© 2018 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xi, 132 pages : |
| Other physical details |
illustrations (some color), charts ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 336 ## - CONTENT TYPE |
| Content type term |
text |
| Source |
rdacontent |
| 336 ## - CONTENT TYPE |
| Content type term |
text |
| Source |
rdacontent |
| 337 ## - MEDIA TYPE |
| Media type term |
unmediated |
| Source |
rdamedia |
| 337 ## - MEDIA TYPE |
| Media type term |
computer |
| Source |
rdamedia |
| 338 ## - CARRIER TYPE |
| Carrier type term |
volume |
| Source |
rdacarrier |
| 338 ## - CARRIER TYPE |
| Carrier type term |
computer disc |
| Source |
rdacarrier |
| 347 ## - DIGITAL FILE CHARACTERISTICS |
| File type |
text file |
| Encoding format |
PDF |
| Source |
rda |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Civil Engineering & Earth Resources |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Thesis (Master of Science in Civil Engineering) -- Universiti Malaysia Pahang – 2018 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Includes bibliographical references |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Safety and Health Performance evaluation of construction projects have long been an issue due to the complexity of each project. There are no standard criteria that can be used as a benchmark to evaluate the safety performance of a construction company for a particular construction project. For construction projects under Jabatan Kerja Raya (JKR) valuing over RM20 million, two mandatory documents for submission are Safety and Health Plan before start of the project and monthly Safety and Health Report throughout the execution of the project. Theoretically, using these two documents as baselines, a standard benchmarking tool can be formulated to apply for future projects. A theoretical framework was developed from literature review to cover all important variables in crafting a Safety and Health Plan (and subsequently, the monthly SH Report). These variables were then formed into a survey in which 193 respondents consisting of personnel in safety and health field participated in order to determine their viability. Both the variables and results of the survey were then reviewed by a panel of experts to be analysed and refined. Based on their input, a benchmarking tool was formed. It was then applied to three randomly selected projects of various completion tages to evaluate its effectiveness in determining the performance of safety and health aspect in terms of their SH Plan. The same three projects are also evaluated using existing benchmark tool and the scores compared. The study concluded that the formulated benchmarking tool and its selected variables were consistent in determining the level of safety and health performance of the selected projects and that further refinement can be made in terms of its application on-site. It is also noted that all the projects evaluated had unacceptable level of safety performance regardless of the initial scoring received for SH Plan formulation. It is suggested that continuous monitoring and adjustment be made so that the benchmark variable can be further improved. In this regard, an online system can be developed to enable seamless integration of on-site assessment and off-site analysis of the generated results, enabling sharing and discussion among safety and health peers. |
| 610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME |
| Corporate name or jurisdiction name as entry element |
Faculty of Civil Engineering & Earth Resources |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Universities and colleges |
| General subdivision |
Disertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Theses |