Process plants : (Record no. 76557)

MARC details
000 -LEADER
fixed length control field 01636nam a2200265 a 4500
001 - CONTROL NUMBER
control field vtls000077358
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251125100006.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 140407t2014 xxua f 001 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9781466517332
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201502091102
Level of effort used to assign nonsubject heading access points ariffin
-- 201404071624
-- ida
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) TP155.75 .S24 2014
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Sahoo, Trinath
245 10 - TITLE STATEMENT
Title Process plants :
Remainder of title shutdown and turnaround management /
Statement of responsibility, etc. Trinath Sahoo
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Boca Raton :
Name of publisher, distributor, etc. CRC Press,
Date of publication, distribution, etc. 2014
300 ## - PHYSICAL DESCRIPTION
Extent xxiii, 382 p. :
Other physical details ill. (some col.) ;
Dimensions 24 cm.
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references and index
520 ## - SUMMARY, ETC.
Summary, etc. "With large amounts of revenue at stake, process industries are focusing more on turnaround management as they strive to lengthen the interval between turnarounds. This book outlines a strategy to execute optimized shutdown and turnaround by changing plant operating conditions and inspection techniques. Because shutdown cost for a petroleum refinery is normally 30 percent higher than annual maintenance costs, this book details how to manage the more favorable turnaround option. The author explores different aspects, including philosophy, planning and scheduling, estimation, contractor management, and execution. The book also addresses safety management, human resources management, and post-shutdown review"--
Assigning source Provided by publisher
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Chemical process control
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Chemical plants
General subdivision Safety measures
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Industrial management
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Plant shutdowns
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Cost, normal purchase price Total checkouts Full call number Barcode Date last seen Copy number Cost, replacement price Price effective from Koha item type
  Not lost     UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019 528.18   TP155.75 .S24 2014 0000092535 04/09/2019 1 528.18 04/09/2019 Open Shelf

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us