MARC details
| 000 -LEADER |
| fixed length control field |
03248nam a2200361 i 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000103574 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113401.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
180523s2018 my a f a m 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0000706(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905171006 |
| Level of effort used to assign nonsubject heading access points |
nazirah |
| Level of effort used to assign subject headings |
201805241128 |
| Level of effort used to assign classification |
fateeha |
| Level of effort used to assign subject headings |
201805231046 |
| Level of effort used to assign classification |
fateeha |
| -- |
201805231035 |
| -- |
fateeha |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| Language of cataloging |
eng |
| Transcribing agency |
UMP |
| Description conventions |
rda |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
FKASA .S93 2018 r Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Siti Nur Syafiqah Mohd Sa'don, |
| Relator term |
author. |
| 245 10 - TITLE STATEMENT |
| Title |
Barriers in the implementation of IBS formwork in Malaysian construction industry / |
| Statement of responsibility, etc. |
Siti Nur Syafiqah Mohd Sa'don |
| 264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE |
| Place of production, publication, distribution, manufacture |
Kuantan, Pahang : |
| Name of producer, publisher, distributor, manufacturer |
UMP, |
| Date of production, publication, distribution, manufacture, or copyright notice |
2018 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
x, 54 pages : |
| Other physical details |
illustrations (some color) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD ROM |
| 336 ## - CONTENT TYPE |
| Content type term |
text |
| Source |
rdacontent |
| 336 ## - CONTENT TYPE |
| Content type term |
text |
| Source |
rdacontent |
| 337 ## - MEDIA TYPE |
| Media type term |
unmediated |
| Source |
rdamedia |
| 337 ## - MEDIA TYPE |
| Media type term |
computer |
| Source |
rdamedia |
| 338 ## - CARRIER TYPE |
| Carrier type term |
volume |
| Source |
rdacarrier |
| 338 ## - CARRIER TYPE |
| Carrier type term |
computer disc |
| Source |
rdacarrier |
| 347 ## - DIGITAL FILE CHARACTERISTICS |
| File type |
text file |
| Encoding format |
PDF |
| Source |
rda |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Civil Engineering and Earth Resources |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project Paper (Bachelor Degree in Civil Engineering) -- Universiti Malaysia Pahang – 2018 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Includes bibliographical references |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Nowadays, in Malaysian construction industry, the use of IBS as a method of construction is develop rapidly, but not for this type of IBS; IBS formwork or prefabricated formwork. This research is to focal point the critical factors of implementation the used of Industrialized Building System (IBS) formwork or namely as pre-fabricated formwork system in the Malaysian construction industry. Based on the reviews of a previous research and related literature, this paper was identified five (5) main barriers and challenging criteria that classified as a difficulties to the success of IBS formwork system application; the issues related to product technical limitation, high initial cost & financial barriers, lack incentive & promotion guidance, less product support and lack exposure on IBS formwork were highlight as a key dimension for the uses of IBS formwork system to success. The objective of this paper is to investigate the practice of IBS formwork in Malaysian construction industry, determine barriers in implementation of IBS in Malaysian construction industry and to point out the main barriers in implementation of IBS formwork in Malaysian construction industry. Questionnaires survey was conducted in order to achieve the objectives. The respondents consisted of person who involved in construction project. The data were tabulated using Microsoft Excel and then analyzed using frequency analysis, average index and ranked. In conclusion, the barriers of IBS implementation in Malaysia has been identified and discussed. According to this research, product technical limitation, high initial cost & financial barriers and lack incentive & promotion guidance are the main barriers factor in IBS implementation in Malaysia. |
| 610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME |
| Corporate name or jurisdiction name as entry element |
Faculty of Civil Engineering and Earth Resources |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Universities and Colleges |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Theses |