A system dynamics model to assess the interrelationship between different knowledge areas of PMBOK in a construction project / (Record no. 7892)

MARC details
000 -LEADER
fixed length control field 04252ntm a2200349 i 4500
001 - CONTROL NUMBER
control field vtls000104511
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113407.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180725s2018 my da f am 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0000103(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905131142
Level of effort used to assign nonsubject heading access points nazirah
-- 201807251526
-- saini
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
Language of cataloging eng
Transcribing agency UMP
Description conventions rda
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FIM .Z35 2018 r Thesis
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Zainab A Malik
Relator term author.
245 12 - TITLE STATEMENT
Title A system dynamics model to assess the interrelationship between different knowledge areas of PMBOK in a construction project /
Statement of responsibility, etc. Zainab A Malik
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Kuantan, Pahang :
Name of producer, publisher, distributor, manufacturer UMP,
Date of production, publication, distribution, manufacture, or copyright notice 2018
300 ## - PHYSICAL DESCRIPTION
Extent xii, 127 pages :
Other physical details illustrations (some color), charts ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
336 ## - CONTENT TYPE
Content type term text
Source rdacontent
337 ## - MEDIA TYPE
Media type term unmediated
Source rdamedia
337 ## - MEDIA TYPE
Media type term computer
Source rdamedia
338 ## - CARRIER TYPE
Carrier type term volume
Source rdacarrier
338 ## - CARRIER TYPE
Carrier type term computer disc
Source rdacarrier
347 ## - DIGITAL FILE CHARACTERISTICS
File type text file
Encoding format PDF
Source rda
500 ## - GENERAL NOTE
General note Faculty of Industrial Management
502 ## - DISSERTATION NOTE
Dissertation note Thesis (Master of Science) -- Universiti Malaysia Pahang -- 2018
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references
520 3# - SUMMARY, ETC.
Summary, etc. Successful construction projects are difficult to achieve in the dynamic and complex construction industry. Successful project management requires the application of knowledge areas in project management while managing projects and completing projects as scheduled. The Project Management Institute (PMI) has issued ten areas of knowledge that are interconnected with each other as a guide to project management. It has also explained step by step clearly for every area of knowledge in the Project Management Body of Knowledge (PMBOK). Existing research has focused on these areas of knowledge, either separately or individually to solve problems in a project. This situation can cause results taken in one area of knowledge to bring problems to other knowledge areas because the areas of knowledge related to the problem are seen separately. Therefore, this study was set up to solve the problem of project managers who made ineffective decision making due to looking at areas of knowledge related separately with the proposal to identify the connectivity and the relationship between different knowledge areas of PMBOK in construction projects. The areas of knowledge used in this study are procurement management, scope management, stakeholder management, integrated management, and human resource management. These five areas of knowledge are derived from a case study. Then, a causal loop is constructed to see the relationship between the knowledge field and is translated into stock and flow diagrams to develop a system dynamic model. After that, the system dynamic model was built and the model was tested. Only then, the required information is included and the recommendation strategy is formulated. Through the system dynamic model, project managers can link between different and relevant areas of knowledge, simulate and view them in larger descriptions. Simulation explains the behavior of the project and its relation to the pre-construction project process with different areas of knowledge in project management. After analyzing all the important data using the system dynamic model, it was found that pre-construction projects had been postponed around 38.7% from the schedule. This is due to several activities that can be done simultaneously, but done one by one. Additionally, project managers put inadequate number of employees to complete the project as scheduled. Through the system dynamic model, models can suggest possible strategies for reducing project completion time by combining several activities that can be carried out simultaneously and increase the number of employees sufficient to complete the project in a given time. Finally, the system dynamic model in this study can show forecasts if the results of the combined activities and the employees are added, the problem of completion of the project completion can be reduced.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Industrial Management
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and colleges
General subdivision Disertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost Library of Congress Classification   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   FIM .Z35 2018 r Thesis 0000123630 04/09/2019 1 04/09/2019 Thesis
  Not lost Library of Congress Classification   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 11407 | FIM .Z35 2018 r Thesis 0000123631 04/09/2019 1 04/09/2019 Thesis

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us