MARC details
| 000 -LEADER |
| fixed length control field |
02781ntm a2200373 i 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000105631 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113409.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
190419t20182018my a f am 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0000386(Local) |
| Terms of availability |
hardback |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905141800 |
| Level of effort used to assign nonsubject heading access points |
nazirah |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| Language of cataloging |
eng |
| Transcribing agency |
UMP |
| Description conventions |
rda |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
FKASA .F37 2018 r Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Nur Farhana Hamzah, |
| Relator term |
author. |
| 245 10 - TITLE STATEMENT |
| Title |
Challenges and barriers of building information modelling (BIM) implementation in construction industry / |
| Statement of responsibility, etc. |
Nur Farhana Hamzah |
| 264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE |
| Place of production, publication, distribution, manufacture |
Kuantan, Pahang : |
| Name of producer, publisher, distributor, manufacturer |
UMP, |
| Date of production, publication, distribution, manufacture, or copyright notice |
2018 |
| 264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE |
| Date of production, publication, distribution, manufacture, or copyright notice |
© 2018 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xvi, 90 pages : |
| Other physical details |
illustrations (some color) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 336 ## - CONTENT TYPE |
| Content type term |
text |
| Source |
rdacontent |
| 336 ## - CONTENT TYPE |
| Content type term |
text |
| Source |
rdacontent |
| 337 ## - MEDIA TYPE |
| Media type term |
unmediated |
| Source |
rdamedia |
| 337 ## - MEDIA TYPE |
| Media type term |
computer |
| Source |
rdamedia |
| 338 ## - CARRIER TYPE |
| Carrier type term |
volume |
| Source |
rdacarrier |
| 338 ## - CARRIER TYPE |
| Carrier type term |
computer disc |
| Source |
rdacarrier |
| 347 ## - DIGITAL FILE CHARACTERISTICS |
| File type |
text file |
| Encoding format |
PDF |
| Source |
rda |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Civil Engineering and Earth Resources |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2018 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Includes bibliographical references |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Building Information Modelling (BIM) is an intelligent model-based process that provides insight for creating and managing building and infrastructure projects faster, more economically and with less environmental impact. It also represents the process of development and use of a computer generated model to simulate the planning, design, construction and operation of a facility. BIM is defined as a modelling technology and associated set of processes to produce, communicate, and analyse building models throughout the entire project's lifecycle. Although there is bound of benefits that gained from the BIM application, the local construction industry still reluctant to deploy the technology in delivery its services. The objectives of the study is to identify the types of challenges from relevant literature review related to BIM, to design the questionnaire on the challenges and barriers during the implementation of BIM and to analyse the effect of challenges to the outcome of BIM. The survey questionnaires were distributed in the construction field, consultant firm and architecture firm within Klang Valley. The method of data collection is by questionnaire and also simple interview. The main conclusion drawn from the study are cost, lack of collaborative work processes and modelling standards and fragmented nature are the most largest challenges and barriers in the implementation of BIM in construction industry. |
| 610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME |
| Corporate name or jurisdiction name as entry element |
Faculty of Civil Engineering and Earth Resources |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Universities and colleges |
| General subdivision |
Disertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Theses |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) |
| Source of classification or shelving scheme |
Library of Congress Classification |
| Koha item type |
Thesis |