The role of building information modelling design application in mitigating the variation order in Jordanian construction industry / (Record no. 7990)

MARC details
000 -LEADER
fixed length control field 05152ntm a2200373 i 4500
001 - CONTROL NUMBER
control field vtls000105496
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113410.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 190221t20182018my da f am 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0000497(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905151532
Level of effort used to assign nonsubject heading access points nazirah
Level of effort used to assign subject headings 201902211222
Level of effort used to assign classification nazri
-- 201902211218
-- nazri
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
Language of cataloging eng
Transcribing agency UMP
Description conventions rda
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FKASA .J34 2018 r Thesis
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Ja’far, Al-Diabat Al-Btoosht,
Relator term author.
245 14 - TITLE STATEMENT
Title The role of building information modelling design application in mitigating the variation order in Jordanian construction industry /
Statement of responsibility, etc. Ja’far Al-Diabat Al-Btoosh
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Kuantan, Pahang :
Name of producer, publisher, distributor, manufacturer UMP,
Date of production, publication, distribution, manufacture, or copyright notice 2018
264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Date of production, publication, distribution, manufacture, or copyright notice © 2018
300 ## - PHYSICAL DESCRIPTION
Extent xiv, 179 pages :
Other physical details illustrations, charts ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
336 ## - CONTENT TYPE
Content type term text
Source rdacontent
336 ## - CONTENT TYPE
Content type term text
Source rdacontent
337 ## - MEDIA TYPE
Media type term unmediated
Source rdamedia
337 ## - MEDIA TYPE
Media type term computer
Source rdamedia
338 ## - CARRIER TYPE
Carrier type term volume
Source rdacarrier
338 ## - CARRIER TYPE
Carrier type term computer disc
Source rdacarrier
347 ## - DIGITAL FILE CHARACTERISTICS
File type text file
Encoding format PDF
Source rda
500 ## - GENERAL NOTE
General note Faculty of Civil Engineering and Earth Resources
502 ## - DISSERTATION NOTE
Dissertation note Thesis (Doctor of Philosophy of Science in Civil Engineering) -- Universiti Malaysia Pahang – 2018
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references
520 3# - SUMMARY, ETC.
Summary, etc. Variation order is a major challenge facing the construction industry. It can be defined as changes to the contract documents in the original agreement. It might be a change in quality, or quantity or any forms of change that affect the project. Several researchers in Jordan have inspected the variation orders sources, and a variety of clarifications have been recommended to minimize their causes, nevertheless variation order kept hardly influencing the construction industry. Though, Building Information Modelling (BIM) as a tool to minimize the variation order effects in Jordan has not been examined. Moreover, researchers confirmed a knowledge gap, in terms of BIM awareness through Jordanian construction industry. Literature indicates that the use of BIM in the Jordanian construction industry is lagging behind. The aim of this study is to develop a BIM framework to minimize the variation orders causes on the governmental construction project in Jordan. To meet that aim, a comprehensive literature review was conducted in terms of BIM capability to reduce V.O. impact on construction project around the world. Furthermore, the researcher designed a questionnaire to collect the data required in regard of VO causes and the BIM capability to address this issue. The response rate was around 70% (105/150). The questionnaire answers were analyzed descriptively and statistically by Partial Least Squares (PLS), and Relative Importance Index (RII). The causes of variation order in the Jordanian construction industry were further categorized into four main groups, namely client-related causes, contractor causes, consultant causes and causes arising from unforeseen circumstances of the project. The outcomes of this research (dependent on a relative importance index (RII)) indicate that the most frequent causes of variation orders in Jordan construction industry were, inaccurate quantity take-off, unskilled labourers, missing material specifications, logistic delays, internal politics, shortage of equipment and tools, technology changes, shortage of human and equipment Resource, absence of construction manuals and procedures, unavailability of the required labour skills, change of scope or plans by owners. It was also found that 50% of these causes were initiated by consultants, 20 % by clients and unforeseen variations, while 10 % only were initiated by contractor. Moreover, it was found that BIM Design Applications, Facility Operations Simulation, Exploration Design Scenarios, BIM Design Detection and BIM Quantity Take-off and Cost Estimation were found to be significantly capable to minimize VO. The research concluded that there is a significant positive relationship between the use of BIM applications and minimizing in the variation order in Jordanian construction industry. This means that the variation orders will decrease significantly if BIM applications is used and supports a case for using BIM as a means of reducing the variation order in the Jordanian construction industry. Finally, focus group workshop was used to validate this framework. Focus group workshop was used to investigate the relationship between the causes of variation order and the functions and features of BIM, which validated the positive effects of using BIM in terms of minimizing the variation order by minimizing the main causes. This research introduced a helpful contribution through a detailed BIM design application framework to minimize variation order, the study recommended to use this framework to solve many problems related to construction industry.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Civil Engineering and Earth Resources
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and colleges
General subdivision Disertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost Library of Congress Classification   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   FKASA .J34 2018 r Thesis 0000126598 04/09/2019 1 04/09/2019 Thesis
  Not lost Library of Congress Classification   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 11566 | FKASA .J34 2018 r Thesis 0000126599 04/09/2019 1 04/09/2019 Thesis

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us