MARC details
| 000 -LEADER |
| fixed length control field |
02443ntm a2200289 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000098198 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113436.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
161129t2016 my a f m 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0007871(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201906131115 |
| Level of effort used to assign nonsubject heading access points |
nazri |
| Level of effort used to assign subject headings |
201712141638 |
| Level of effort used to assign classification |
saini |
| -- |
201611291533 |
| -- |
fateeha |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
FKASA .N397 2016 r Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Nurnazirah Muhamad Ramzi |
| 245 10 - TITLE STATEMENT |
| Title |
Building information modelling (BIM) application in facilities management / |
| Statement of responsibility, etc. |
Nurnazirah Muhamad Ramzi |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2016 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xiii, 71 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Civil Engineering and Earth Resources |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2016 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 69-71 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Since BIM method become common in the construction industry during design and construction phases of construction, owner, operators and facility managers have not recognized the benefits of BIM can bring to them during the operational and maintenance phase. Facilities Management (FM) is becoming progressively vital issue in the operation and maintenance phase in Malaysian construction industry. Facilities Management in Malaysia is still uncommon amongst contractor. This research is mainly discusses about the efficiency of Building Information Modelling (BIM) application in Facilities Management. The aim of this research is to define the work flow for authoring 3D BIM architecture model, to describe the benefits of BIM application in FM industry. For this research only cover facilities management of architecture discipline. The methodology of this research is begin with literature review, 3D modelling and project parameter. In this research, the process flow for 3D model of the building is explain systematically with an aid figures. The finding whether BIM is well suited for facility management and can improve the operational and maintenance phase by give a solid information data source for the facility manager. |
| 610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME |
| Corporate name or jurisdiction name as entry element |
Faculty of Civil Engineering and Earth Resources |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Universities and Colleges |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Theses |
| 856 40 - ELECTRONIC LOCATION AND ACCESS |
| Uniform Resource Identifier |
<a href="http://ecollib.ump.edu.my/id/eprint/25595">http://ecollib.ump.edu.my/id/eprint/25595</a> |
| Public note |
Access in library only |