Material takeoff for building information modeling (BIM) – Architectural component / (Record no. 8733)

MARC details
000 -LEADER
fixed length control field 02807nam a2200289 a 4500
001 - CONTROL NUMBER
control field vtls000098168
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113436.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 161124t2016 my a f 001 0 eng|d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0007890(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201906131121
Level of effort used to assign nonsubject heading access points nazri
Level of effort used to assign subject headings 201712121522
Level of effort used to assign classification fateeha
-- 201611241650
-- safura
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FKASA .S93 2016 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Muhammad Syaiful Ahdat Bin Muhamad Fetri
245 10 - TITLE STATEMENT
Title Material takeoff for building information modeling (BIM) – Architectural component /
Statement of responsibility, etc. Muhammad Syaiful Ahdat Bin Muhamad Fetri
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2016
300 ## - PHYSICAL DESCRIPTION
Extent xiii, 62 p. :
Other physical details ill. ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Civil Engineering and Earth Resources
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2016
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 61-62
520 3# - SUMMARY, ETC.
Summary, etc. Today advance technology have impact to construction industries in Malaysia is going from strength to strength, with a whole host of newly-announced project promising to increase activity that showed the industries are rapidly growth year by year. To achieve the good in quality of the construction it consist of three important component, first is scope of work followed by the cost for the construction and lastly is time that needed to complete the construction. The proper cost estimation, monitor and control are the key point of success of construction. Nowadays estimator still rely on the 2D CAD drawing to perform the material take off which lack of information that required by estimator. The uses of BIM tools as a model based on estimation and materials takeoff are clear state in this research by compared it with the manual method to perform the material take-off. This is because by using manual approaches contributed to miscalculation problem. This research also can be a sample to use Revit software to perform full material takeoff for architectural 3D model for the lab building. Continue, the research are until providing the price for quantity survey based on architect 3D model that model by using Revit software. The methodology for this research is from modelling 3D architect for lab building until conduct cost estimation for architecture component in the building. Overall in this study, researcher, performing material takeoff and cost estimation by using BIM based on 3D architect model for architect component only.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Civil Engineering and Earth Resources
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and Colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/id/eprint/26022">http://ecollib.ump.edu.my/id/eprint/26022</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost Library of Congress Classification   Not for loan Reference UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   FKASA .S93 2016 r Bc. 0000115065 04/09/2019 1 04/09/2019 Final Year Report
  Not lost Library of Congress Classification   Not for loan Reference UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 10306 | FKASA .S93 2016 r Bc. 0000115066 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us