MARC details
| 000 -LEADER |
| fixed length control field |
03548ntm a2200373 i 4500 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
MY-KuUP |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251125105414.0 |
| 006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS |
| fixed length control field |
t||||fr|||| 000 0 |
| 007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION |
| fixed length control field |
ta |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
191024t20182018my a|||frm||| 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0008316(Local) |
| Qualifying information |
hardback |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| Language of cataloging |
eng |
| Transcribing agency |
UMP |
| Description conventions |
rda |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
FKASA .H375 2018 r Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Mohd Harisuddin Hasnan, |
| Relator term |
author. |
| 245 20 - TITLE STATEMENT |
| Title |
A study on the design changes affecting the construction project: point of view from contractor perspective / |
| Statement of responsibility, etc. |
Mohd Harisuddin Hasnan |
| 264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE |
| Place of production, publication, distribution, manufacture |
Kuantan, Pahang : |
| Name of producer, publisher, distributor, manufacturer |
UMP, |
| Date of production, publication, distribution, manufacture, or copyright notice |
2018 |
| 264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE |
| Date of production, publication, distribution, manufacture, or copyright notice |
© 2018 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xii, 84 pages : |
| Other physical details |
illustrations ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 336 ## - CONTENT TYPE |
| Content type term |
text |
| Source |
rdacontent |
| 336 ## - CONTENT TYPE |
| Content type term |
text |
| Source |
rdacontent |
| 337 ## - MEDIA TYPE |
| Media type term |
unmediated |
| Source |
rdamedia |
| 337 ## - MEDIA TYPE |
| Media type term |
computer |
| Source |
rdamedia |
| 338 ## - CARRIER TYPE |
| Carrier type term |
volume |
| Source |
rdacarrier |
| 338 ## - CARRIER TYPE |
| Carrier type term |
computer disc |
| Source |
rdacarrier |
| 347 ## - DIGITAL FILE CHARACTERISTICS |
| File type |
text file |
| Encoding format |
PDF |
| Source |
rda |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Civil Engineering and Earth Resources |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2018 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Includes bibliographical references |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Although many project time delays, cost overruns and quality defects particularly in the construction sector are attributed to design changes, the associated issues have not yet been thoroughly investigated. At this time, problems with design changes are still one of the major problems in construction. In today’s practice, every design made at the early stage has been agreed upon by the parties involved in the construction work but on request of the client and been approved by the consultant, the design of the construction can be changed. The objective of this is to study the change in design affecting the construction project from the contractors’ point of view. Questionnaires survey were distributed to the group of contractors accordingly in order to obtain information and analysis on the subject matter which is by identifying the causes affecting the change in design of construction project. The scopes of this research will cover the area in East Coast of Malaysia. It is focusing on the causes of design change in the engineering practitioners. Data gathering carried out by doing literature review and applying a questionnaire survey through contractors that has been selected and registered under CIDB. An analysis being carried out using SPSS software & Relative Importance Index (RII) has shown a tremendous result in finding the most influential factors affecting the design changes. According to all the data being collected, the entire objectives for this study are archived and there are 37 main causes to the design changes in construction projects which have been identified. They are change in design, current economic situation, error or omission occurred during construction phase, replacement of material and work procedure as well as lack of data and information required for the design. While for the effect of design changes, the respondent choose cost overrun while conducting the project as it cannot be completed in time and they agreed to look for another solution other than changing the design to overcome this design changes problems. |
| 610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME |
| Corporate name or jurisdiction name as entry element |
Faculty of Civil Engineering and Earth Resources |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Universities and Colleges |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Theses |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) |
| Source of classification or shelving scheme |
Library of Congress Classification |
| Koha item type |
Final Year Report |