A case study of 4D BIM implementation on on inrastructure project / (Record no. 92433)

MARC details
000 -LEADER
fixed length control field 03150ntm a2200385 i 4500
003 - CONTROL NUMBER IDENTIFIER
control field MY-KuUP
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251125105544.0
006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS
fixed length control field t||||fr|||| 000 0
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION
fixed length control field ta
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 200701t20192019my a|||fram|| 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0008688(Local)
Qualifying information hardback
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
Language of cataloging eng
Transcribing agency UMP
Description conventions rda
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FKASA .S54 2019 r Bc.
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Sherene, Thai Shi Yin,
Relator term author.
245 12 - TITLE STATEMENT
Title A case study of 4D BIM implementation on on inrastructure project /
Statement of responsibility, etc. Sherene Thai Shi Yin
246 #3 - VARYING FORM OF TITLE
Title proper/short title A case study of four D BIM implementation on inrastructure project
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Kuantan, Pahang :
Name of producer, publisher, distributor, manufacturer UMP,
Date of production, publication, distribution, manufacture, or copyright notice 2019
264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Date of production, publication, distribution, manufacture, or copyright notice © 2019
300 ## - PHYSICAL DESCRIPTION
Extent xii, 53 pages :
Other physical details illustrations ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
336 ## - CONTENT TYPE
Content type term text
Source rdacontent
336 ## - CONTENT TYPE
Content type term text
Source rdacontent
337 ## - MEDIA TYPE
Media type term unmediated
Source rdamedia
337 ## - MEDIA TYPE
Media type term computer
Source rdamedia
338 ## - CARRIER TYPE
Carrier type term volume
Source rdacarrier
338 ## - CARRIER TYPE
Carrier type term computer disc
Source rdacarrier
347 ## - DIGITAL FILE CHARACTERISTICS
File type text file
Encoding format PDF
Source rda
500 ## - GENERAL NOTE
General note Faculty of Civil Engineering and Earth Resources
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references
520 3# - SUMMARY, ETC.
Summary, etc. The implementation of 4D Building Information Modeling is the integration between 3D BIM model and time as forth-dimension. The benefit of 4D BIM model is to support an improvement on visualization and interpretation of project stakeholders toward the construction project design and project scheduling. Throughout the entire project lifecycle, it helps to provide a better communication and collaboration with project stakeholders, ensure the project constructability, time-space, logistic and resources management. However, there are still minority implementation of this development in construction industry. The current project methods are required users to visualize and interpret the project scheduling themselves. Besides, to determine the feasibility of the project schedule is apart from ability to generate it. Only experienced project players that familiar with the construction nature system are able to manage the gap existed in industry. The case study involved in this thesis study is an infrastructure project of breakwater system. It was structured to reduce the intensity of wave action inshore water and thereby reduce the coastal erosion. To fulfil the main purpose of this thesis study, the implementation of 4D BIM model on infrastructure project, three objectives was achieved. With the generated 3D BIM model with construction planning and scheduling, by bit the final products of 4D BIM simulation was developed. This simulation had shown the 4D BIM implementation on an infrastructure project was significant advantageous in visualization, interpretation and feasibility of the project as they involved construction below sea water level. This help to improve the management, planning, construction and designing team in collaboration and communication.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Civil Engineering and Earth Resources
General subdivision Disertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and colleges
General subdivision Disertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Restricted Collection
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection Home library Current library Shelving location Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost Library of Congress Classification   Not for loan Reference UMPLIB GAMBANG UMPLIB GAMBANG Reference 01/07/2020   FKASA .S54 2019 r Bc. T000000672 12/10/2020 1 01/07/2020 Thesis
  Not lost Library of Congress Classification     Reference UMPLIB GAMBANG UMPLIB GAMBANG   01/07/2020   CD12564 T000000673 09/03/2021 1 01/07/2020 Thesis

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us