MARC details
| 000 -LEADER |
| fixed length control field |
03150ntm a2200385 i 4500 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
MY-KuUP |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251125105544.0 |
| 006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS |
| fixed length control field |
t||||fr|||| 000 0 |
| 007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION |
| fixed length control field |
ta |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
200701t20192019my a|||fram|| 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0008688(Local) |
| Qualifying information |
hardback |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| Language of cataloging |
eng |
| Transcribing agency |
UMP |
| Description conventions |
rda |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
FKASA .S54 2019 r Bc. |
| 100 1# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Sherene, Thai Shi Yin, |
| Relator term |
author. |
| 245 12 - TITLE STATEMENT |
| Title |
A case study of 4D BIM implementation on on inrastructure project / |
| Statement of responsibility, etc. |
Sherene Thai Shi Yin |
| 246 #3 - VARYING FORM OF TITLE |
| Title proper/short title |
A case study of four D BIM implementation on inrastructure project |
| 264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE |
| Place of production, publication, distribution, manufacture |
Kuantan, Pahang : |
| Name of producer, publisher, distributor, manufacturer |
UMP, |
| Date of production, publication, distribution, manufacture, or copyright notice |
2019 |
| 264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE |
| Date of production, publication, distribution, manufacture, or copyright notice |
© 2019 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xii, 53 pages : |
| Other physical details |
illustrations ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 336 ## - CONTENT TYPE |
| Content type term |
text |
| Source |
rdacontent |
| 336 ## - CONTENT TYPE |
| Content type term |
text |
| Source |
rdacontent |
| 337 ## - MEDIA TYPE |
| Media type term |
unmediated |
| Source |
rdamedia |
| 337 ## - MEDIA TYPE |
| Media type term |
computer |
| Source |
rdamedia |
| 338 ## - CARRIER TYPE |
| Carrier type term |
volume |
| Source |
rdacarrier |
| 338 ## - CARRIER TYPE |
| Carrier type term |
computer disc |
| Source |
rdacarrier |
| 347 ## - DIGITAL FILE CHARACTERISTICS |
| File type |
text file |
| Encoding format |
PDF |
| Source |
rda |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Civil Engineering and Earth Resources |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Includes bibliographical references |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
The implementation of 4D Building Information Modeling is the integration between 3D BIM model and time as forth-dimension. The benefit of 4D BIM model is to support an improvement on visualization and interpretation of project stakeholders toward the construction project design and project scheduling. Throughout the entire project lifecycle, it helps to provide a better communication and collaboration with project stakeholders, ensure the project constructability, time-space, logistic and resources management. However, there are still minority implementation of this development in construction industry. The current project methods are required users to visualize and interpret the project scheduling themselves. Besides, to determine the feasibility of the project schedule is apart from ability to generate it. Only experienced project players that familiar with the construction nature system are able to manage the gap existed in industry. The case study involved in this thesis study is an infrastructure project of breakwater system. It was structured to reduce the intensity of wave action inshore water and thereby reduce the coastal erosion. To fulfil the main purpose of this thesis study, the implementation of 4D BIM model on infrastructure project, three objectives was achieved. With the generated 3D BIM model with construction planning and scheduling, by bit the final products of 4D BIM simulation was developed. This simulation had shown the 4D BIM implementation on an infrastructure project was significant advantageous in visualization, interpretation and feasibility of the project as they involved construction below sea water level. This help to improve the management, planning, construction and designing team in collaboration and communication. |
| 610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME |
| Corporate name or jurisdiction name as entry element |
Faculty of Civil Engineering and Earth Resources |
| General subdivision |
Disertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Universities and colleges |
| General subdivision |
Disertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Theses |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) |
| Source of classification or shelving scheme |
Library of Congress Classification |
| Koha item type |
Restricted Collection |