MARC details
| 000 -LEADER |
| fixed length control field |
02818ntm a2200373 i 4500 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
MY-KuUP |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251125105545.0 |
| 006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS |
| fixed length control field |
t||||fr|||| 000 0 |
| 007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION |
| fixed length control field |
ta |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
200702t20192019my a|||fram|| 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0008692(Local) |
| Qualifying information |
hardback |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| Language of cataloging |
eng |
| Transcribing agency |
UMP |
| Description conventions |
rda |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
FKASA .W37 2019 r Bc. |
| 100 1# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Abdulwasea Al-Malik, Mohammed Abdullah Saeed, |
| Relator term |
author. |
| 245 10 - TITLE STATEMENT |
| Title |
Identifying the critical success factors of BIM implementation in Malaysia / |
| Statement of responsibility, etc. |
Mohammed Abdullah Saeed Abdulwasea Al-Malik |
| 264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE |
| Place of production, publication, distribution, manufacture |
Kuantan, Pahang : |
| Name of producer, publisher, distributor, manufacturer |
UMP, |
| Date of production, publication, distribution, manufacture, or copyright notice |
2019 |
| 264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE |
| Date of production, publication, distribution, manufacture, or copyright notice |
© 2019 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xi, 57 pages : |
| Other physical details |
illustrations ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 336 ## - CONTENT TYPE |
| Content type term |
text |
| Source |
rdacontent |
| 336 ## - CONTENT TYPE |
| Content type term |
text |
| Source |
rdacontent |
| 337 ## - MEDIA TYPE |
| Media type term |
unmediated |
| Source |
rdamedia |
| 337 ## - MEDIA TYPE |
| Media type term |
computer |
| Source |
rdamedia |
| 338 ## - CARRIER TYPE |
| Carrier type term |
volume |
| Source |
rdacarrier |
| 338 ## - CARRIER TYPE |
| Carrier type term |
computer disc |
| Source |
rdacarrier |
| 347 ## - DIGITAL FILE CHARACTERISTICS |
| File type |
text file |
| Encoding format |
PDF |
| Source |
rda |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Civil Engineering and Earth Resources |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Includes bibliographical references |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Building Information Modelling (BIM) is one of modern technology that promising a lot of benefits towards architecture, engineering and construction (AEC) industries. The potential of BIM will improve overall in the construction performance in term of cost effectiveness, increase quality of project and reduce time to develop the project. It helps architects, engineers, clients, and constructors to visualize what is to be built in through a 3D model and identify potential design, construction or operational problems. In Malaysia, BIM has introduced to AEC industry by public work department(PWD) since 2007, but the rate of implementing BIM is still very low within construction projects. Thus, this study is focusing in identifying the critical success factors for enhancing BIM implementation in Malaysia. To achieve the aim of the study, related objective been set which are study the current situation of BIM adoption in the construction industry, level of awareness among stakeholders and identify CSFs for implementing of BIM. Factors have been identified through literature review and modified by pilot study to suit the situation in Malaysia. These CSFs are classified into four categories are management, process, people, and technology. Consequently, data analysis has done to identify the most critical success factors that play a main role in enhancing implementation of building information modelling by using relative importance index (RII) analysis method. |
| 610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME |
| Corporate name or jurisdiction name as entry element |
Faculty of Civil Engineering and Earth Resources |
| General subdivision |
Disertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Universities and colleges |
| General subdivision |
Disertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Theses |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) |
| Source of classification or shelving scheme |
Library of Congress Classification |
| Koha item type |
Restricted Collection |