Identification factor of constraint in road construction in Sabah / (Record no. 92552)

MARC details
000 -LEADER
fixed length control field 02824ntm a2200373 i 4500
003 - CONTROL NUMBER IDENTIFIER
control field MY-KuUP
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251125105551.0
006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS
fixed length control field t||||fr|||| 000 0
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION
fixed length control field ta
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 200709t20192019my a|||fram|| 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0008720(Local)
Qualifying information hardback
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
Language of cataloging eng
Transcribing agency UMP
Description conventions rda
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FKASA .A855 2019 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Nur Atika Abd Rahman,
Relator term author.
245 10 - TITLE STATEMENT
Title Identification factor of constraint in road construction in Sabah /
Statement of responsibility, etc. Nur Atika Abd Rahman
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Kuantan, Pahang :
Name of producer, publisher, distributor, manufacturer UMP,
Date of production, publication, distribution, manufacture, or copyright notice 2019
264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Date of production, publication, distribution, manufacture, or copyright notice © 2019
300 ## - PHYSICAL DESCRIPTION
Extent xi, 46 pages :
Other physical details illustrations (some color) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
336 ## - CONTENT TYPE
Content type term text
Source rdacontent
336 ## - CONTENT TYPE
Content type term text
Source rdacontent
337 ## - MEDIA TYPE
Media type term unmediated
Source rdamedia
337 ## - MEDIA TYPE
Media type term computer
Source rdamedia
338 ## - CARRIER TYPE
Carrier type term volume
Source rdacarrier
338 ## - CARRIER TYPE
Carrier type term computer disc
Source rdacarrier
347 ## - DIGITAL FILE CHARACTERISTICS
File type text file
Encoding format PDF
Source rda
500 ## - GENERAL NOTE
General note Faculty of Civil Engineering and Earth Resources
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references
520 3# - SUMMARY, ETC.
Summary, etc. Constraint in road construction can be defined as anything that limits an organization or entity from moving toward or achieving its goal to accomplish the project. Constraints in a multi-party working situation bring complications in road construction project management. These can further develop into conflicts and disputes, which bring cost consequences, direct and indirect, to clients and contractor (Yates, 2002). It is important to identify the potential constraints in the construction project, which will help to decrease the unnecessary wastage and loss of both money and time because of inadequate planning. Therefore, the main goal of this study was to identify the factor of constraint in road construction. This study carried out based on literature review and questionnaire survey. A total of five categories were contributed to the main factor of constraint in road construction was identified based on literature review. A questionnaire survey was distributed to the randomly respondent in Sabah. The target respondent of questionnaire are developer, consultant, contractor, engineer and project manager. The top three most important factors that contributed to constraint in road construction were budget limit and allocation of the money for the construction not enough, poor company management, and price fluctuation. Social constraint and economic constraint were ranked the main categories of constraint in road construction, followed by legal constraint, technical constraint and environmental constraint.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Civil Engineering and Earth Resources
General subdivision Disertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and colleges
General subdivision Disertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Final Year Report
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection Home library Current library Shelving location Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost Library of Congress Classification   Not for loan Reference UMPLIB GAMBANG UMPLIB GAMBANG Reference 09/07/2020   FKASA .A855 2019 r Bc. T000000729 07/10/2020 1 09/07/2020 Final Year Report
  Not lost Library of Congress Classification     Reference UMPLIB GAMBANG UMPLIB GAMBANG   09/07/2020   CD12592 T000000730 17/11/2020 1 09/07/2020 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us