An empirical investigation the adoption factors of building information modelling (BIM) from the perspective of Malaysian Civil And Structure Consultant Firms / (Record no. 96297)

MARC details
000 -LEADER
fixed length control field 04733nam a2200349 i 4500
003 - CONTROL NUMBER IDENTIFIER
control field MY-KuUP
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251125105945.0
006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS
fixed length control field a||||fr|||| 001 0
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION
fixed length control field ta
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 220223t20212021my a|||fram|| 001 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0009213(Local)
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
Language of cataloging eng
Transcribing agency UMP
Description conventions rda
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FTKA .Z34 2021 r Thesis
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Zahrizan Zakaria,
Relator term author.
245 13 - TITLE STATEMENT
Title An empirical investigation the adoption factors of building information modelling (BIM) from the perspective of Malaysian Civil And Structure Consultant Firms /
Statement of responsibility, etc. Zahrizan Zakaria
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Kuantan, Pahang :
Name of producer, publisher, distributor, manufacturer UMP,
Date of production, publication, distribution, manufacture, or copyright notice 2021
264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture © 2021
300 ## - PHYSICAL DESCRIPTION
Extent xiii, 210 pages :
Other physical details illustrations (some color) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
336 ## - CONTENT TYPE
Content type term text
Source rdacontent
337 ## - MEDIA TYPE
Media type term unmediated
Source rdamedia
338 ## - CARRIER TYPE
Carrier type term volume
Source rdacarrier
347 ## - DIGITAL FILE CHARACTERISTICS
File type text file
Encoding format PDF
Source rda
500 ## - GENERAL NOTE
General note Faculty of Civil Engineering Technology
502 ## - DISSERTATION NOTE
Dissertation note Thesis (Doctor of Philosophy in Civil Engineering Technology) -- Universiti Malaysia Pahang – 2020
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references
520 3# - SUMMARY, ETC.
Summary, etc. The construction industry in the Fourth Industrial Revolution (IR 4.0) have to focus on high-technology jobs such as technological skill rather than labour-intensive approach and low-skilled job. But, most of the construction industries in Malaysia are using traditional approach which is labour-intensive approach and it has resulted in fragmentation issue among the project participants resulting less productivity and inefficiency in delivering the project. In order to tackle this issue, Building Information Modelling (BIM) can offer a platform to integrate between different parties in the construction industry. It also offers a lot of benefits to construction industry in term of productivity and efficiency. Even though there are a lot of benefits that can be gained by BIM utilisation and many efforts to increase the adoption of BIM in construction projects such as conducting the seminars, workshops and incentives but, the rate of BIM adoption by the Malaysian construction players is still low compared to other Asians countries. Therefore, there is a need to study the adoption factors within Malaysian construction industry that could facilitate the pace of BIM adoption in Malaysia especially from the perspective of civil and structure (C&S) consultant firms. Several studies had explored the way to increase the pace of BIM adoption from the perspective of architectures, facilities management, quantity surveyor and contractors, and very little effort to identify the adoption factors and its relationship that could facilitate the adoption of BIM especially from the perspective of C&S consultant firms. C&S consultant firm plays a vital role to ensure the design is constructible, operable and maintainable. Thus, the aim of this study is to examine the relationship between organizations, people and technology towards making decisions in adopting BIM from the perspective C&S consultant firm. In this study, qualitative and quantitative approaches have been utilised as research method to develop in-depth understanding of the happening by obtaining the views on the subject studied especially the current application of BIM in the Malaysian construction industry. At the same time, this study is conducted to explore what are the factors that affecting the adoption of BIM in the Malaysian construction industry. Lack of national guideline for implementing BIM, pressure from clients or governments and lacking of technical support from BIM experts are the vital challenges faced by the adopters besides having a higher cost of early investment in BIM technology. Analysis from multiple linear regression revealed the factors that have a strong relationship in influencing organisation to adopt BIM are; having a strong support from the top management, having a coercive pressure, having a clear BIM implementation plan, undergo training, having a BIM competency team, having a clear job specification for new roles, BIM technology must free from interoperability issue, less cost of technology, and the issue of compatibility. This study offers a new insight from the perspective of C&S consultant firms on the adoption of BIM and could improve the rate of BIM adoption. At the same time, it could fill the gap from previous studies by extending the study of BIM adoption by investigating from C&S consultant firm’s point of view and it complementing the overall view of BIM adoption from all participants.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Civil Engineering Technology
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Thesis
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection Home library Current library Shelving location Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost Library of Congress Classification   Final Processing Reference UMPLIB GAMBANG UMPLIB GAMBANG Reference 12/01/2022   FTKA .Z34 2021 r Thesis T000001668 12/01/2022 1 12/01/2022 Thesis
  Not lost Library of Congress Classification     Reference UMPLIB GAMBANG UMPLIB GAMBANG   23/02/2022   CD 13000 T000001669 25/08/2022 1 23/02/2022 Thesis

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us