Management of change framework with integrated risk analysis for temporary and emergency cases / (Record no. 96537)

MARC details
000 -LEADER
fixed length control field 05071ntm a2200361 i 4500
003 - CONTROL NUMBER IDENTIFIER
control field MY-KuUP
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251125110001.0
006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS
fixed length control field t||||fr|||| 000 0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 220322b2021 my a|||frm||| 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0009176(Local)
Qualifying information hardback
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
Language of cataloging eng
Transcribing agency UMP
Description conventions rda
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FSTI .P36 2021 r Thesis
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Pang Kar Kei,
Relator term author.
245 10 - TITLE STATEMENT
Title Management of change framework with integrated risk analysis for temporary and emergency cases /
Statement of responsibility, etc. Pang Kar Kei
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Kuantan, Pahang :
Name of producer, publisher, distributor, manufacturer UMP,
Date of production, publication, distribution, manufacture, or copyright notice 2021
264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Date of production, publication, distribution, manufacture, or copyright notice © 2021
300 ## - PHYSICAL DESCRIPTION
Extent xiv, 139 pages :
Other physical details illustrations ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
336 ## - CONTENT TYPE
Content type term text
Source rdacontent
336 ## - CONTENT TYPE
Content type term text
Source rdacontent
337 ## - MEDIA TYPE
Media type term unmediated
Source rdamedia
337 ## - MEDIA TYPE
Media type term computer
Source rdamedia
338 ## - CARRIER TYPE
Carrier type term volume
Source rdacarrier
338 ## - CARRIER TYPE
Carrier type term computer disc
Source rdacarrier
347 ## - DIGITAL FILE CHARACTERISTICS
File type text file
Encoding format PDF
Source rda
500 ## - GENERAL NOTE
General note Faculty of Industrial Sciences and Technology
502 ## - DISSERTATION NOTE
Dissertation note Thesis (Master of Science ) -- Universiti Malaysia Pahang – 2021
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references
520 3# - SUMMARY, ETC.
Summary, etc. Process industries overgrow due to increasing demand for petroleum made products.The potential of major accident may significantly increase even more when temporary and emergency change is implemented. In fact, temporary and emergency changes were identified as one of the main contributors to the failure of Management of Change (MOC) in industries, leading to catastrophic outcomes in process industries. However, current MOC implementation and attention, especially towards temporary and emergency, lack in process industries due to inconsistency and different interpretation based on the established standards, time constraint and availability of data.. Corresponding to these weaknesses, an integrated risk analysis framework and system for temporary and emergency change based on PSM is developed. The concept of this research is targeting to provide complete guidance with the aids of documents and software for implementation of temporary and emergency software. Objectives of this research are, to develop temporary and emergency MOC framework, to develop a management system on MOC and to validate frameworks and management system developed through a pilot study. The research process begin with analysing all the requirements in the OSHA PSM standard and including into critical action item in the framework. Framework on temporary and emergency cases is established based on the adopted permanent MOC framework and selected PSM standard requirement. Adopted risk assessment checklists have been proposed with an embedded risk rating to improve risk prioritisation. The developed framework was transformed into a model known as Management of Change Management System (MOCMS) to improve tracking of open and expiring temporary MOC case and ease the process to retrieve information. The validation process of developed framework and system have been conducted through a pilot study by obtaining real data from process plant and testing applicability of developed result by repeating real-life temporary change case using developed framework and software. Meanwhile interview session has been conducted to obtain user and expert feedbacks on the developed results.Results of this study comprised of an overview of the MOC process displayed by a PDCA cycle, a complete MOC process framework with an adopted checklist, and a MOC management system acting as a guidance and documentation software. In overall, the developed framework has complied with the current practice in real process plant where all the necessary forms and checklist used are covered in the developed framework. Besides, the developed framework has proposed more comprehensive and detailed action items, such as specific risk assessment for organisational change and detailed risk assessment checklist in technical and technological change. In addition, the developed management system equipped with the features of recording time taken for every action item has successfully tracked the time taken for a specific action item. It is found that the time required for the completion of risk assessment in the developed framework is relatively shorter than the original MOC risk assessment process. Therefore, the pilot study has confirmed the MOC framework met critical elements in the MOC of selected MOC regulation with improvement to identified issues. The performance of the MOC framework and software shall be measure on the timely completion of MOC action items, and improvement in In contrast, the management system is reliable to improve system documentation and information storage
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Industrial Sciences and Technology
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Thesis
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection Home library Current library Shelving location Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost Library of Congress Classification   Not for loan Reference UMPLIB GAMBANG UMPLIB GAMBANG Reference 24/01/2022   FSTI .P36 2021 r Thesis T000001711 12/05/2022 1 24/01/2022 Thesis
  Not lost Library of Congress Classification   Not for loan Reference UMPLIB GAMBANG UMPLIB GAMBANG Reference 22/03/2022   CD13023 T000001712 30/01/2023 1 22/03/2022 Thesis

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us