Bim adoption framework to enhance efficiency of contractual issues in the jordanian construction sector / (Record no. 97817)

MARC details
000 -LEADER
fixed length control field 04383ntm a2200373 i 4500
003 - CONTROL NUMBER IDENTIFIER
control field MY-KuUP
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251125110124.0
006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS
fixed length control field t||||fr|||| 00| 0
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION
fixed length control field ta
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 221011s2022 my aa||frm||| 00| 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0009362(Local)
Qualifying information hardback
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
Language of cataloging eng
Transcribing agency UMP
Description conventions rda
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FTKA .I27 2022 r Thesis
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Ibrahim Moh'd Abdel Qader Saraireh,
Relator term author
245 10 - TITLE STATEMENT
Title Bim adoption framework to enhance efficiency of contractual issues in the jordanian construction sector /
Statement of responsibility, etc. Ibrahim Moh'd Abdel Qader Saraireh
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Kuantan, Pahang :
Name of producer, publisher, distributor, manufacturer UMP,
Date of production, publication, distribution, manufacture, or copyright notice 2022
264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Date of production, publication, distribution, manufacture, or copyright notice © 2022
300 ## - PHYSICAL DESCRIPTION
Extent xix, 311 pages :
Other physical details illustrations (some color) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
336 ## - CONTENT TYPE
Content type term text
Source rdacontent
336 ## - CONTENT TYPE
Content type term text
Source rdacontent
337 ## - MEDIA TYPE
Media type term unmediated
Source rdamedia
337 ## - MEDIA TYPE
Media type term computer
Source rdamedia
338 ## - CARRIER TYPE
Carrier type term volume
Source rdacarrier
338 ## - CARRIER TYPE
Carrier type term computer disc
Source rdacarrier
347 ## - DIGITAL FILE CHARACTERISTICS
File type text file
Encoding format PDF
Source rda
500 ## - GENERAL NOTE
General note Faculty of Civil Engineering Technology
502 ## - DISSERTATION NOTE
Dissertation note Thesis (Doctor of Philosophy in Civil Engineering) -- Universiti Malaysia Pahang – 2022
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references
520 3# - SUMMARY, ETC.
Summary, etc. Construction contracts are becoming more challenging these days with the rise of complexity in design, competitive profit margins, diverse requirements and the emergence of many disruptive technologies. Additionally, the construction contracts require extensive information and documentation to be successfully managed. Ineffective strategy and management often lead to disputes between the stakeholders. In Jordan, many contractual problems affect the contract administration. Thus, it weakened the construction industry's contribution to Growth Domestic Product (GDP) in recent years. The contractual problems are costly and time-consuming to resolve. Many researchers have documented Building Information Modelling (BIM) as a considerably efficient approach to reduce the contractual problems in the projects. It lies on the capability of BIM to integrate information, centralize communication, improve understandings of designs through virtual 3D and resolve conflict virtually before the physical activities take place. Despite many benefits, the implementation of BIM, however, requires an appropriate regulatory framework to succeed. Therefore, this study fills the research gap by developing a conceptual framework for adopting BIM to improve the efficiency of the contractual issues in the construction sector in Jordan. A mixed-method of data collection was adopted to achieve the research’s objectives. It included interviews with 27 experts, 410 completed questionnaires surveys and 25 experts participated in the focus group validation workshop. The data collected from the interviews & workshop were analyzed by using the content analysis technique. Questionnaire responses were analyzed descriptively and statistically using SPSS software. The results from the interviews show that the major contractual issues contributed from problems related to the tender documents (contracts, drawings), contractual parties, arbitration and disputes resolution, problems related to technology use, financial problems and administrative problems. On the other hand, the results from the questionnaire confirmed that the significant barriers to BIM adoption include the lack of BIM awareness with an RII score of 0.736, lack of BIM training centres with an RII score of 0.724 and lack of support from the government with an RII score of 0.700. Furthermore, the findings of questionnaires assured that the main benefits of BIM adoption are as-built drawings with an RII score of 0.828, data sharing among parties with an RII score of 0.766, clash detection with an RII score of 0.760. In addition, improving the design with an RII score of 0.756 and save cost and time with an RII score of 0.756. This research highlighted the critical contractual problems during the project life cycle. Moreover, the study offers a conceptual framework for BIM adoption as a viable solution to overcome the contractual issues, and the barriers of BIM adoption, which will ultimately boost the performance of the Jordanian construction sector.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Civil Engineering Technology
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Thesis
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost Library of Congress Classification   Not for loan Reference UMPLIB GAMBANG UMPLIB GAMBANG 11/10/2022   FTKA .I27 2022 r Thesis T000001961 11/10/2022 1 11/10/2022 Thesis
  Not lost Library of Congress Classification   Not for loan   UMPLIB GAMBANG UMPLIB GAMBANG 11/10/2022   CD13144 T000001962 30/01/2023 1 11/10/2022 Thesis

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us