Successful implementation of erosion and sedimentation control plan for reducing environmental impact in the construction industry / (Record no. 99210)

MARC details
000 -LEADER
fixed length control field 05318ntm a2200361 i 4500
003 - CONTROL NUMBER IDENTIFIER
control field MY-KuUP
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251125110248.0
006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS
fixed length control field t||||fr|||| 000 0
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION
fixed length control field ta
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 230329t20222022my a|||fr|||| 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0009531 (Local)
Qualifying information Hardback
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
Language of cataloging eng
Transcribing agency UMP
Description conventions rda
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FTKA .A87 2022 r Thesis
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Asri Syahmi bin Asnor,
Relator term author.
245 10 - TITLE STATEMENT
Title Successful implementation of erosion and sedimentation control plan for reducing environmental impact in the construction industry /
Statement of responsibility, etc. Asri Syahmi bin Asnor
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Kuantan, Pahang :
Name of producer, publisher, distributor, manufacturer UMP,
Date of production, publication, distribution, manufacture, or copyright notice 2022
264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Date of production, publication, distribution, manufacture, or copyright notice ©2022
300 ## - PHYSICAL DESCRIPTION
Extent xi, 108 pages :
Other physical details illustrations,
Dimensions 30 cm. +
Accompanying material 1 CD ROM
336 ## - CONTENT TYPE
Source rdacontent
Content type term text
336 ## - CONTENT TYPE
Source rdacontent
Content type term text
337 ## - MEDIA TYPE
Source rdamedia
Media type term unmediated
337 ## - MEDIA TYPE
Source rdamedia
Media type term computer
338 ## - CARRIER TYPE
Source rdacarrier
Carrier type term volume
338 ## - CARRIER TYPE
Source rdacarrier
Carrier type term computer disc
347 ## - DIGITAL FILE CHARACTERISTICS
Source rda
File type text file
Encoding format PDF
500 ## - GENERAL NOTE
General note Faculty of Civil Engineering Technology
502 ## - DISSERTATION NOTE
Dissertation note Thesis (Master of Science) -- Universiti Malaysia Pahang – 2022
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references
520 3# - SUMMARY, ETC.
Summary, etc. Human-made erosion and sedimentation can severely affect the environment. Environmental protection plans, including the erosion and sedimentation control plan (ESCP), can reduce construction sites' environmental impacts. However, numerous challenges are hindering successful ESCP implementation. This study shows support for the United Nations Sustainable Development Goals. This study is done towards the 11th goal, 11.C, sustainable cities and communities. SDG 11's official mission is to "Make cities inclusive, safe, resilient and sustainable" (Assembly, U. G., 2017). While understanding the underlying challenges in ESCP implementation can address that problem, that information is lacking. This study investigates the factors for implementing ESCP successfully in developing countries such as Malaysia by determining the key challenges for implementing ESCP, identifying the critical success factors for implementing ESCP, and classifying the relationship between the identified critical factors. The target population for the interviews is individual professionals that are involved in ESCP implementation, including officers from the Department of Environment, the Department of Irrigation and Drainage, and Infrastructure Department of City Halls, City Councils, Municipal Councils, and District Councils, Engineers and Environmental officers of contractors and consultant firms. This research uses a questionnaire survey as the methodology to answer the research objective. Therefore, this study identifies the key challenges in implementing ESCP at construction sites. To achieve that objective, data from the 102 participants in the key challenges in implementing ESCP surveys undergo the descriptive analysis to find the mean and standard deviation before the normalized value is calculated. The normalized value indicates the success factor is critical, and the success factor is important when normalized is above 0.50. Then, from the normalized value, the overall data is listed. Factor analysis minimizes the number of variables at each factor with large loads and groups them into several groups of a component. Finally, the list of components for both research objectives is listed. Key challenges in implementing ESCP can be categorized into three components: knowledge, attitude and awareness, technical issue, and cost. Solving these challenges may increase the implementation of ESCP. Thus, it will save our environment while building our nation. At the same time, critical success factors in implementing ESCP can be categorized into four components: Enforcement, Knowledge, Attitude and Awareness, Management, and Planning. Implementing these factors may result in an increase in the implementation of ESCP in our construction industry. Thus, Malaysia can develop while maintaining its natural treasures for our future generations. Last but not least, this paper helps create awareness, knowledge, and importance of ESCP helps to manage their resource allocation properly, assisting industry practitioners to develop strategies that target to eliminate the less effective method that is currently used to improves the success rate of implementing ESCP, adding new literature in current literature, and support government authorities in policymaking to decide between tackling problems related to the implementing of ESCP. The major findings include the key challenges for implementing ESCP are: ‘progress between ESCP and construction works is not parallel,’ ‘lack of publicity on ESCP,’ ‘failure to maintain ESCP facilities periodically,’ ‘cost-reduction process in ESCP implementation,’ ‘contractors perceived that ESCP is overcharged,’ and ‘completed the ESCP just for the report.’ Also, the fragmentation between project stakeholders in the construction industry results in other key challenges that partially affect some project members. These findings contribute a better knowledge in developing strategies for effective ESCP implementation to protect the environment.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Civil Engineering Technology
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and colleges
General subdivision Dissertations
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Thesis
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost Library of Congress Classification   Not for loan Reference UMPLIB GAMBANG UMPLIB GAMBANG 29/03/2023   FTKA .A87 2022 r Thesis T000002066 29/03/2023 1 29/03/2023 Thesis
  Not lost Library of Congress Classification   In Transit   UMPLIB GAMBANG UMPLIB GAMBANG 29/03/2023   CD 13200 T000002067 29/03/2023   29/03/2023 Thesis

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us