Integrated process knowledge management system based on risk based process safety in petrochemical industries / (Record no. 99340)

MARC details
000 -LEADER
fixed length control field 04673ntm a2200373 i 4500
003 - CONTROL NUMBER IDENTIFIER
control field MY-KuUP
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251125110726.0
006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS
fixed length control field t||||fr|||| 000 0
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION
fixed length control field ta
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 230410t20222022my a|||fr|||| 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0009444 (Local)
Qualifying information Hardback
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
Language of cataloging eng
Transcribing agency UMP
Description conventions rda
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FSTI .I99 2022 r Thesis
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Nur Izzati Pakhor Anuar,
Relator term author.
245 10 - TITLE STATEMENT
Title Integrated process knowledge management system based on risk based process safety in petrochemical industries /
Statement of responsibility, etc. Nur Izzati Pakhor Anuar
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Pahang :
Name of producer, publisher, distributor, manufacturer UMP,
Date of production, publication, distribution, manufacture, or copyright notice 2022
264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Date of production, publication, distribution, manufacture, or copyright notice © 2022
300 ## - PHYSICAL DESCRIPTION
Extent xvi, 171 pages :
Other physical details Illustration ;
Dimensions 30 cm.+
Accompanying material 1 CD ROM
336 ## - CONTENT TYPE
Source rdacontent
Content type term text
337 ## - MEDIA TYPE
Source rdamedia
Media type term unmediated
337 ## - MEDIA TYPE
Source rdamedia
Media type term unmediated
337 ## - MEDIA TYPE
Source rdamedia
Media type term computer
338 ## - CARRIER TYPE
Source rdacarrier
Carrier type term volume
338 ## - CARRIER TYPE
Source rdacarrier
Carrier type term computer disc
347 ## - DIGITAL FILE CHARACTERISTICS
Source rda
File type text file
Encoding format PDF
500 ## - GENERAL NOTE
General note Faculty of Industrial Sciences and Technology
502 ## - DISSERTATION NOTE
Dissertation note Thesis (Master of Science) -- Universiti Malaysia Pahang – 2022
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references
520 3# - SUMMARY, ETC.
Summary, etc. Risk Based Process Safety (RBPS) guideline objective is to help the petrochemical industries to comply with Process Safety Management (PSM) standard. Outdated, scatted, and inaccessible process knowledge have been identified as significant causal factors of major accidents. Changing Process Knowledge Management (PKM) data can affect other elements, and changes in other elements also affect the reliability and accuracy of PKM elements. The shortcoming of study regarding PKM element interrelationship with other 19 Risk Based Process Safety (RBPS) has hindered the effectiveness of RBPS program. Besides that, lacking systematic system to implement the PKM program that integrates with others RBPS elements also delayed the improvement of process safety levels at the workplace. The research objectives of the study are to determine interrelationship of PKM element with other 19 RBPS elements, to develop a PKM flowchart and integrated flowchart based on RBPS guidelines, to develop integrated PKM system named Process Safety Knowledge Expert (PSKE) and to validate the developed PSKE via case studies, focus group discussion and System Usability Scale (SUS) study in Petrochemical industries. The research methodology used a qualitative, exploratory research design. The interrelationship of the PKM element with other 19 RBPS elements based on possible work activities used hierarchical structure (waterfall approach) and the interrelationship is presented into the mapping diagram and matrix table. A PKM flowchart, which consists of vital information and an implementation strategy to fulfil RBPS guideline requirements, was developed and integrated flowchart that highlights the interrelationship of PKM with other RBPS elements was developed after comprehensive literature review. Then, PSKE was developed using System Development Life Cycle (SDLC) approach. The front-end technology of PSKE used the Ionic framework apps development, meanwhile back-end technology used Firebase product by Google. Validation of the system involved three stages including case study at petrochemical Plant X, focus group discussion and System Usability Scale (SUS) study involving nine plant personnel (expert and key person) from HSSE and Operation department. PKM interrelationship matrix table has systematically confirmed that PKM has significant interrelationship with all of 19 RBPS elements. From the case study, PSKE allow the end-user to store, review, modify and update the data regarding hazardous chemicals, technology, and equipment information in real time. PSKE interfaces allow management to do a self-check audit and help the management to track the information. As a leading indicator, PSKE allows the user to review the overall status of the company compliance to the safety standard. In addition, PSKE allows management or employees to manage and review the PKM program, Process Hazard Analysis (PHA) and Asset Integrity and Reliability (AIAR) program simultaneously. For the SUS study, there are four statements scored 89% and all of 10 SUS statements got 0% for the scale ‘Disagree’ and ‘Strongly Disagree’. It can be concluded that PSKE received positive feedback in term of usability in petrochemical industries. Hopefully the system could help to increase the safety level at petrochemical plant and prevent major accidents simultaneously.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Industrial Sciences and Technology
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Thesis
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Thesis
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost Library of Congress Classification   Not for loan Reference UMPLIB GAMBANG UMPLIB GAMBANG 10/04/2023   FSTI .I99 2022 r Thesis T000002179 10/04/2023 1 10/04/2023 Thesis
  Not lost Library of Congress Classification   In Transit Reference UMPLIB GAMBANG UMPLIB GAMBANG 10/04/2023   CD13256 T000002180 10/04/2023 1 10/04/2023 Thesis

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us