MARC details
| 000 -LEADER |
| fixed length control field |
03465ntm a2200373 i 4500 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
MY-KuUP |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251125110740.0 |
| 006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS |
| fixed length control field |
t||||fr|||| 000 0 |
| 007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION |
| fixed length control field |
ta |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
230612t20232023my a|||fr|||| 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0009658 (Local) |
| Qualifying information |
Hardback |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| Language of cataloging |
eng |
| Transcribing agency |
UMP |
| Description conventions |
rda |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
FIM .F37 2023 r Thesis |
| 100 1# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Siti Nur Farhain Binti Mohd Yusri, |
| Relator term |
author. |
| 245 10 - TITLE STATEMENT |
| Title |
Overcoming causes of claim disputes in construction projects: a dematel based model / |
| Statement of responsibility, etc. |
Siti Nur Farhain Binti Mohd Yusri |
| 264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE |
| Place of production, publication, distribution, manufacture |
Kuantan, Pahang : |
| Name of producer, publisher, distributor, manufacturer |
UMP, |
| Date of production, publication, distribution, manufacture, or copyright notice |
2023 |
| 264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE |
| Date of production, publication, distribution, manufacture, or copyright notice |
©2023 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xi, 107 pages : |
| Other physical details |
illustrations (some color) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 336 ## - CONTENT TYPE |
| Source |
rdacontent |
| Content type term |
text |
| 336 ## - CONTENT TYPE |
| Source |
rdacontent |
| Content type term |
text |
| 337 ## - MEDIA TYPE |
| Source |
rdamedia |
| Media type term |
unmediated |
| 337 ## - MEDIA TYPE |
| Source |
rdamedia |
| Media type term |
computer |
| 338 ## - CARRIER TYPE |
| Source |
rdacarrier |
| Carrier type term |
volume |
| 338 ## - CARRIER TYPE |
| Source |
rdacarrier |
| Carrier type term |
computer disc |
| 347 ## - DIGITAL FILE CHARACTERISTICS |
| Source |
rda |
| File type |
text file |
| Encoding format |
PDF |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Industrial Management |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Thesis (Master of Science) -- Universiti Malaysia Pahang – 2023 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Includes bibliographical references |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Claim disputes are inevitable as construction projects are renowned for being extremely complicated and loaded with risk and necessitate long-term collaboration among a variety of parties. Previous studies have only investigated the causes and effects of claim disputes in the construction sector; little have investigated the relationship between the different factors of causes and less on proposing strategies to overcome claim disputes. The aim of this study is to analyse the main causes of claim disputes in construction projects, and to propose strategies to avoid claim disputes in construction projects by adopting mixed method research that combines qualitative and quantitative data which utilizes DEMATEL method of data analysis by exploring the relationships between those factors. A list of causes and strategies for the study was produced from a review of the relevant literatures, with sixteen (16) causes and nine (9) strategies were retrieved. The approach known as Decision-Making Trial and Evaluation Laboratory, or DEMATEL, was applied to construct a causal relationship between the factors of causes and strategies with the goal of better comprehending these dynamics and finding effective ways to address them. According to the data obtained from thirteen (13) respondents, the primary contributing causes of claim disputes in construction projects are project cost underestimation (C7), poor communication among the parties (C15), contract violation (C4), contract misinterpretation (C5), contractor's financial difficulties (C3), variation order due to client's new requirements (C8), conflicting drawings and specifications (C14), and omissions and errors in design (C13). On the other hand, five (5) most significant strategies to overcome claim disputes in construction projects are RFI Procedure (S6), clarity of contract language (S2), effective communication (S3), Critical Path Method (CPM) (S8), and joint recognition of changes (S5). The findings of this study can provide significant assistance in developing a plan to effectively handle the issue of claim disputes that exists within the industry for the stakeholders in the construction sector and also, the government. |
| 610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Universities and colleges |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Thesis |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) |
| Source of classification or shelving scheme |
Library of Congress Classification |
| Koha item type |
Thesis |