Development of risk management framework for the construction industry in yemen / (Record no. 99759)

MARC details
000 -LEADER
fixed length control field 05260ntm a2200361 i 4500
003 - CONTROL NUMBER IDENTIFIER
control field MY-KuUP
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251125110753.0
006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS
fixed length control field t||||fr|||| 000 0
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION
fixed length control field ta
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 230718t20232023my a|||fr|||| 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0009666 (Local)
Qualifying information Hardback
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
Language of cataloging eng
Transcribing agency UMP
Description conventions rda
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FTKA .R36 2023 r Thesis
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Rami Abdullah Ali Ba Hamid,
Relator term author.
245 10 - TITLE STATEMENT
Title Development of risk management framework for the construction industry in yemen /
Statement of responsibility, etc. Rami Abdullah Ali Ba Hamid,
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Kuantan, Pahang :
Name of producer, publisher, distributor, manufacturer UMP,
Date of production, publication, distribution, manufacture, or copyright notice 2022
264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Date of production, publication, distribution, manufacture, or copyright notice ©2022
300 ## - PHYSICAL DESCRIPTION
Extent xiv, 304 pages :
Other physical details illustrations ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
336 ## - CONTENT TYPE
Source rdacontent
Content type term text
336 ## - CONTENT TYPE
Source rdacontent
Content type term text
337 ## - MEDIA TYPE
Source rdamedia
Media type term unmediated
337 ## - MEDIA TYPE
Source rdamedia
Media type term computer
338 ## - CARRIER TYPE
Source rdacarrier
Carrier type term volume
338 ## - CARRIER TYPE
Source rdacarrier
Carrier type term computer disc
347 ## - DIGITAL FILE CHARACTERISTICS
Source rda
File type text file
Encoding format PDF
500 ## - GENERAL NOTE
General note Faculty of Civil Engineering Technology
502 ## - DISSERTATION NOTE
Dissertation note Thesis (Doctor of Philosophy in Civil Engineering) -- Universiti Malaysia Pahang – 2023
520 3# - SUMMARY, ETC.
Summary, etc. Yemen is one of the developing poorest economies in the world, yet it has seen extraordinary growth in construction over the last few decades. The construction sector is considered an important sector in developing economies and contributes significantly to the improvement of the economic growth of any country, particularly in developing countries like Yemen. Construction projects regularly experience a high level of uncertainty due to its Complexity, which definitely exposes them to risks that result a negative impact on the project's objectives. Given developing countries' resource constraints compared to developed countries, it is critical to accomplish construction projects on schedule, within budget, and with the highest possible quality. Thus, risk management is a critical component of the construction industry's decision-making process, as it determines the success or failure of construction projects. The absence of application and understanding of risk management leads to poor construction project performance particularly in developing countries. Risk management in construction projects in Yemen is under-researched compared to developed and developing countries, and lacking a suitable risk management framework. Hence, the main objective of this research is to develop a risk management framework in order to improve the performance of construction projects in Yemen. In order to achieve the research objectives, a mixed-method approach was used, which included semi-structured interviews and questionnaires with participants in a construction project in Yemen. Through an extensive literature review, 56 risk factors affecting construction projects in developing countries from43 studies were identified and categorized. Semi-structured interviews with construction experts in Yemen were conducted and 48 risk factors related to the Yemeni construction projects have been identified. A questionnaire survey utilizing a nonprobability sampling method using a five-point scale was carried out among the construction sector in Yemen to identify the most significant risk factors based on the likelihood of occurrence and impact on the objectives of projects, and to evaluate the current practice and knowledge of risk management in construction projects in Yemen,. 174 responses were completed and collected from the public and private sectors. 17 critical risks were identified using the mean, the relative important index method, and risk acceptability matrix analysis. War and political instability, inflation, and exchange rate fluctuations are identified as the most significant risks. Most of the risks are allocated to the contractor or shared between owner and contractor. The current knowledge and practice of the construction projects in Yemen have been evaluated. The results also show that risk management is not implemented in most projects, the majority of participants in construction don’t have adequate knowledge of risk management, and risk management does not apply systematically in construction projects. Based on the findings from the literature reviews, and data analysis a risk management framework has been developed to be served as a guideline for managing risks in construction projects in Yemen and developing countries. The framework was developed based on the principles including developing the existing frameworks; utilizing risk management tools that have been implemented successfully in other countries. The framework has provided incorporated techniques for risk management that is based on well-defined principles. The developed framework has validated using a semi-structured interview with 16 Yemeni construction experts. Experts’ feedback demonstrates that the developed framework is comprehensive and compatible with the Yemen environment, and does not involve complicated processes. This study will serve as a guideline for participants in construction projects in Yemen to improve the performance of construction projects.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Civil Engineering Technology
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
General subdivision Dissertations
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Thesis
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost Library of Congress Classification   Not for loan Reference UMPLIB GAMBANG UMPLIB GAMBANG 18/07/2023   FTKA .R36 2023 r Thesis T000002428 18/07/2023 1 18/07/2023 Thesis
  Not lost Library of Congress Classification       UMPLIB GAMBANG UMPLIB GAMBANG 21/07/2023   CD13379 T000002429 21/07/2023 1 21/07/2023 Thesis

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us