Productivity improvement through line balancing / Hazmil Hapaz

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2008Description: 53 p. : ill. (some col.) ; 30 cm. + 1 computer discISBN:
  • THE0007653(Local)
Other title:
  • Productivity improvement through line balancing [electronic resource]
Subject(s): Dissertation note: Project paper (Bachelor of Mechanical Engineering) -- Universiti Malaysia Pahang - 2008 Abstract: Poor layout design is determine as a major problem contribution in small and medium industry. These particular problems thus affect the productivity and the line efficiency as well. Throughout the study, the aim is to proposed new layout to the related company to increase their productivity. The major step is to identify a bottleneck workstation in current layout. After identify related problems, the current layout is redesign by computing the standard time and processing time in each workstations. In each workstation the processing time is different and the longest time consumption is workstation will be identified as a bottleneck workstation. This related line is studied by time study techniques. The time is taken by stopwatch. In this study, application of Computer Aided tools is introduced which in this study is WITNESS SOFTWARE. The related inputs are going to be simulated with this software. The manual calculation also included especially in line balancing algorithm. The goal of the thesis is to seek the best layout in terms of line efficiency and productivity rate hence proposed to the company. Through out the study, 3 layouts have been achieved. Among 3 layouts only one will be propose to the company. This layout has better line efficiency and rate of productivity.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB PEKAN TS178.5 .H39 2008 rs Bc. (Browse shelf(Opens below)) 1 Not for loan 0000038758
Final Year Report Final Year Report UMPLIB PEKAN CD 3577 | TS178.5 .H39 2008 rs Bc. (Browse shelf(Opens below)) 1 Not for loan 0000038759

Project paper (Bachelor of Mechanical Engineering) -- Universiti Malaysia Pahang - 2008

Poor layout design is determine as a major problem contribution in small and medium industry. These particular problems thus affect the productivity and the line efficiency as well. Throughout the study, the aim is to proposed new layout to the related company to increase their productivity. The major step is to identify a bottleneck workstation in current layout. After identify related problems, the current layout is redesign by computing the standard time and processing time in each workstations. In each workstation the processing time is different and the longest time consumption is workstation will be identified as a bottleneck workstation. This related line is studied by time study techniques. The time is taken by stopwatch. In this study, application of Computer Aided tools is introduced which in this study is WITNESS SOFTWARE. The related inputs are going to be simulated with this software. The manual calculation also included especially in line balancing algorithm. The goal of the thesis is to seek the best layout in terms of line efficiency and productivity rate hence proposed to the company. Through out the study, 3 layouts have been achieved. Among 3 layouts only one will be propose to the company. This layout has better line efficiency and rate of productivity.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us