Case study : demolition practice of old MARA building on Lot 1767, Lot 1218 and Pt 4, Section 46, mukim Bandar Kuala Lumpur, Jalan Tuanku Abdul Rahman / Khairul Faiq Bin Selaiman

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2006Description: 60 p. : ill. (some col.) ; 30 cmISBN:
  • THE0003426(Local)
Subject(s): Dissertation note: Project paper (Bachelor of Civil Engineering) -- Kolej Universiti Kejuruteraan & Teknologi Malaysia - 2006 Abstract: Nowadays, there are various types of procedure or provision issued by many institutions and departments all over the world such as British Standard Institution, Occupational Safety and Health Act, Department of Environment, etc. in order to provide the guideline for good practice and guidance in demolition works. The research contains basic information of procedures, process, techniques and demolition methods, legislative requirement and example of demolition project in this country. It also includes the latest requirement for practitioners on better planning and helps them to select the most suitable demolition method. This research should be used in conjunction with Verified Regulations to develop the work plan for approval by Public Work Department (JKR), Local Authority etc. This study also proposed the procedure on how the work plan is developed. . It is essential to produce the work plan to ensure a systematic and consistent decision can be produced before execution. Beside, a study about demolition work of old MARA building on Lot 1767, Lot 1218 and PT4, section 46, Kuala Lumpur, Jalan Tuanku Abdul Rahman had been conducted to be a guideline in the process of work planning also as an example of legislative requirement needed by local authorities of this country and helping in verification process. -Author
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG TH153 .K43 2006 rs Thesis (Browse shelf(Opens below)) 1 Not for loan 0000030283

Project paper (Bachelor of Civil Engineering) -- Kolej Universiti Kejuruteraan & Teknologi Malaysia - 2006

Nowadays, there are various types of procedure or provision issued by many institutions and departments all over the world such as British Standard Institution, Occupational Safety and Health Act, Department of Environment, etc. in order to provide the guideline for good practice and guidance in demolition works. The research contains basic information of procedures, process, techniques and demolition methods, legislative requirement and example of demolition project in this country. It also includes the latest requirement for practitioners on better planning and helps them to select the most suitable demolition method. This research should be used in conjunction with Verified Regulations to develop the work plan for approval by Public Work Department (JKR), Local Authority etc. This study also proposed the procedure on how the work plan is developed. . It is essential to produce the work plan to ensure a systematic and consistent decision can be produced before execution. Beside, a study about demolition work of old MARA building on Lot 1767, Lot 1218 and PT4, section 46, Kuala Lumpur, Jalan Tuanku Abdul Rahman had been conducted to be a guideline in the process of work planning also as an example of legislative requirement needed by local authorities of this country and helping in verification process. -Author