Critical requirement for client on selecting contractor / Munira Husin

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2010Description: xv, 87 p. : ill. (some col.) ; 30 cm. + 1 computer discISBN:
  • THE0003436(Local)
Other title:
  • Critical requirement for client on selecting contractor [computer file]
Subject(s): Dissertation note: Project paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2010 Abstract: Construction industry grew so rapidly nowadays. Economic development becomes a catalyst in determining the increase in construction industry. During the Eighth Malaysia Plan, the government provides an allocation of RM110 billion for development projects the federal government. There are many contractor failed to win the tender and turn wound up. Money spent to purchase the tender documents is expensive. Contractors feel that they are being abandoned by client and assume that client have cronies in the tender selection process. But regulation is not consistent in producing quality contractors that are among several factors that render defective construction industry. Many projects have been categorized as problematic due to several factors that typically result from the contractor. In the selection of contractors, there are many aspects that need to be considered. Therefore, the objective of this study are to study major factors influencing client requirement in construction industry, to identify the client’s requirement factor on selecting contractor and to analyse the client’s requirements factor on selecting contractor. Average Index and Frequency Analysis will be used to analyze the data collected from the questionnaires and interviews. From the data analysis found that the most first important criteria is experience, second is current workload, third is working reputation, fourth is financial position, fifth is price bit, and finally relationship with client. Apart from that, based on this study are expected to issue a guideline to be fulfilled by contractor in order to win the bidding process easily.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG TH420 .M86 2010 rs Bc. (Browse shelf(Opens below)) 1 Not for loan 0000054675
Final Year Report Final Year Report UMPLIB GAMBANG CD 5151 | TH420 .M86 2010 rs Bc. (Browse shelf(Opens below)) 1 Not for loan 0000054676

Project paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2010

Bibliography : p. 80-81

Construction industry grew so rapidly nowadays. Economic development becomes a catalyst in determining the increase in construction industry. During the Eighth Malaysia Plan, the government provides an allocation of RM110 billion for development projects the federal government. There are many contractor failed to win the tender and turn wound up. Money spent to purchase the tender documents is expensive. Contractors feel that they are being abandoned by client and assume that client have cronies in the tender selection process. But regulation is not consistent in producing quality contractors that are among several factors that render defective construction industry. Many projects have been categorized as problematic due to several factors that typically result from the contractor. In the selection of contractors, there are many aspects that need to be considered. Therefore, the objective of this study are to study major factors influencing client requirement in construction industry, to identify the client’s requirement factor on selecting contractor and to analyse the client’s requirements factor on selecting contractor. Average Index and Frequency Analysis will be used to analyze the data collected from the questionnaires and interviews. From the data analysis found that the most first important criteria is experience, second is current workload, third is working reputation, fourth is financial position, fifth is price bit, and finally relationship with client. Apart from that, based on this study are expected to issue a guideline to be fulfilled by contractor in order to win the bidding process easily.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us