Operational road traffic safety audit at Junction of Kampung Seri Mahkota Aman and Kuantan-Gambang / Tuan Afendey bin Tuan Mood

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2007Description: xii, 81 p. : col. ill. ; 30 cmISBN:
  • THE0001613(Local)
Subject(s): Dissertation note: Project paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2007 Abstract: The arrangements lines and network at junction of Kg. Seri Mahkota Arnan and Kuantan-Gambang Road have rapidly increased as a result of the growth of population and residential areas surrounding. The main problem of that junction is it can cause dangerous maneuver to road users. Many factors lead to this problem such as poor sight distance, inappropriate taper, inappropriate signboard, non existence of marking lines and poor road condition. Although, drivers' carelessness and lack of attention were main factors of traffic accident, attention should also be given to engineering and environment factors. Road Safety Audit Stage 5( operational stage) will be carried out at site. The main objective of this study is to identify the hazardous features at accident-prone locations of an existing road junction and to suggest the traffic safety requirements of all road users considered in the planning, design, construction and operation of road junction. Related traffic data were collected and analyses were done. From the analysis, there were many deficiencies detected at the junction. Although improving the junction design would be costly, minimizing or reducing the deficiencies on the road is essential choice in upgrading the safety of the road users. -Author
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Notes Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG HE5613 .T83 2007 rs Bc. (Browse shelf(Opens below)) 1 Not for loan 0000030372
Final Year Report Final Year Report UMPLIB GAMBANG HE5613 .T83 2007 rs Bc. (Browse shelf(Opens below)) 2 Not for loan c.2 0000044548

Project paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2007

The arrangements lines and network at junction of Kg. Seri Mahkota Arnan and Kuantan-Gambang Road have rapidly increased as a result of the growth of population and residential areas surrounding. The main problem of that junction is it can cause dangerous maneuver to road users. Many factors lead to this problem such as poor sight distance, inappropriate taper, inappropriate signboard, non existence of marking lines and poor road condition. Although, drivers' carelessness and lack of attention were main factors of traffic accident, attention should also be given to engineering and environment factors. Road Safety Audit Stage 5( operational stage) will be carried out at site. The main objective of this study is to identify the hazardous features at accident-prone locations of an existing road junction and to suggest the traffic safety requirements of all road users considered in the planning, design, construction and operation of road junction. Related traffic data were collected and analyses were done. From the analysis, there were many deficiencies detected at the junction. Although improving the junction design would be costly, minimizing or reducing the deficiencies on the road is essential choice in upgrading the safety of the road users. -Author

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us