Survey of project management methods which employed by fixed position layout in Malaysia / Siti Raihana Shahadan

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2012Description: xvi, 53 p. : ill. (some col.) ; 30 cm. + 1 CD-ROMISBN:
  • THE0005557(Local)
Subject(s): Dissertation note: Project paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012 Summary: This thesis presents the survey on the project management methods which employed in fixed-position layout in Malaysia. The objectives of this research are to investigate the type of project management methodology and tools, the factors considered in project management methods and the performance of project management methods implemented in fixed- position layout (construction) in Malaysia. A questionnaire survey about project management methods were conducted at construction companies. Critical path method (CPM), Program Evaluation & Review Technique (PERT) and graphical evaluation & review technique (GERT) have been chosen as predictors in order to predict which project management method most suitable to be employed in fixed-position layout. The survey shows that the most significant method is CCPM and for tools is PERT followed by CPM and lastly GERT. CPM and PERT analysis were implemented to one of the construction project. As a conclusion, by having a good project management system such as CPM and PERT, the fixed position layout industry can strive for better improvement, redefine its image and steer itself in meeting a success in near future.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB PEKAN CD 6277 | T56.8 .R35 2012 rs Bc. (Browse shelf(Opens below)) 1 Not for loan 0000067438
Final Year Report Final Year Report UMPLIB PEKAN T56.8 .R35 2012 rs Bc. (Browse shelf(Opens below)) 1 Not for loan 0000067437

Project paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012

Includes bibliography

This thesis presents the survey on the project management methods which employed in fixed-position layout in Malaysia. The objectives of this research are to investigate the type of project management methodology and tools, the factors considered in project management methods and the performance of project management methods implemented in fixed- position layout (construction) in Malaysia. A questionnaire survey about project management methods were conducted at construction companies. Critical path method (CPM), Program Evaluation & Review Technique (PERT) and graphical evaluation & review technique (GERT) have been chosen as predictors in order to predict which project management method most suitable to be employed in fixed-position layout. The survey shows that the most significant method is CCPM and for tools is PERT followed by CPM and lastly GERT. CPM and PERT analysis were implemented to one of the construction project. As a conclusion, by having a good project management system such as CPM and PERT, the fixed position layout industry can strive for better improvement, redefine its image and steer itself in meeting a success in near future.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us