Implementation of single minute exchange die (SMED) technique to accelerate the mold changing time at sme company / Muhamad Nasruldin Hashim

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2012Description: xiv, 84 p. : ill. (some col.) ; 30 cm. + 1 CD-ROMISBN:
  • THE0007497(Local)
Subject(s): Dissertation note: Project paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012 Summary: The purpose of the Single Minute Exchange Die (SMED) is to eliminate waste of time. Longer set-up time means that the production line is not productive and will left behind by their competitor. Nowadays, everything is been done faster and just-in-time, where manufactures need to produced product in fast and without neglecting the quality issue and deliver it to customer right on time. In this project, SMED had provided the method to eliminate waste of time with their eight technique of SMED introduced by Mr. Shigeo Shingo. In SMED mold or die exchange should be less in 10minute and it took lots of improvement involve by the employee. The project objective is to reduce mold set-up time to 40% is exceeding the expectation where they able to reduce until 51% from the total setup time previously. In overall with the help of everyone, especially from top management of company to their employee, SMED is successfully done and achieve the objective.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB PEKAN TS155.8 .N38 2012 rs Bc. (Browse shelf(Opens below)) 1 Not for loan 0000067431
Final Year Report Final Year Report UMPLIB PEKAN CD 6274 | TS155.8 .N38 2012 rs Bc. (Browse shelf(Opens below)) 1 Not for loan 0000067432

Project paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012

Bibliography : p. 73-76

The purpose of the Single Minute Exchange Die (SMED) is to eliminate waste of time. Longer set-up time means that the production line is not productive and will left behind by their competitor. Nowadays, everything is been done faster and just-in-time, where manufactures need to produced product in fast and without neglecting the quality issue and deliver it to customer right on time. In this project, SMED had provided the method to eliminate waste of time with their eight technique of SMED introduced by Mr. Shigeo Shingo. In SMED mold or die exchange should be less in 10minute and it took lots of improvement involve by the employee. The project objective is to reduce mold set-up time to 40% is exceeding the expectation where they able to reduce until 51% from the total setup time previously. In overall with the help of everyone, especially from top management of company to their employee, SMED is successfully done and achieve the objective.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us