Evaluation of non-value added activities in motorcycle egine assembly process at hicom yamaha manufacturing (m) Sdn bhd / Norli Mohamed Yaacob

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2013Description: xiv, 58 p. : ill. (some col.) ; 30 cm. + 1 CD-ROMISBN:
  • THE0007364(Local)
Subject(s): Dissertation note: a Project paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang – 2013 Abstract: A non-value added activity is one which, if eliminated, would not detract from the customer’s perceived value of the product or service. By reducing the non-value added activities in production line, the productivity and the efficiency can be improve, meanwhile the costs will be reduced. The aim of this study is to evaluate the non-value added activities exists in production line of motorcycle engine assembly process hence suggest some recommendations to reduce the evaluated waste in ways to improve the production line. This research had been conduct at HICOM-Yamaha Manufacturing (M) Sdn. Bhd. (HYMM), Shah Alam for motorcycle engine assembly of model 31D9. While conducting the research, a few methods had been justified for a better and accurate result. The time study method had being used to take the cycle time of the overall process in assemble the 31D9 model engine. Also, a few types of statistical process control chart had being used to analyse the data taken at HYMM. From the research that had been done, there was a station that the average cycle time is out-of-control which is the Station 16 with the average of 36.54 seconds, 5.46 seconds below the actual target. It is also being found that the longest cycle time was at Station 31 with 45.6 seconds, 3.66 seconds exceeding the actual target cycle time. The best improvement that can be suggested is reducing the length of the workstation in which will resulted in decreasing of cycle time that can increase the productivity and the efficiency.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB PEKAN TL445 .N67 2013 rs Bc. (Browse shelf(Opens below)) 1 Not for loan 0000080364
Final Year Report Final Year Report UMPLIB PEKAN CD 7783 | TL445 .N67 2013 rs Bc. (Browse shelf(Opens below)) 1 Final Processing 0000080365

a Project paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang – 2013

Bibliography : p.[59]

A non-value added activity is one which, if eliminated, would not detract from the customer’s perceived value of the product or service. By reducing the non-value added activities in production line, the productivity and the efficiency can be improve, meanwhile the costs will be reduced. The aim of this study is to evaluate the non-value added activities exists in production line of motorcycle engine assembly process hence suggest some recommendations to reduce the evaluated waste in ways to improve the production line. This research had been conduct at HICOM-Yamaha Manufacturing (M) Sdn. Bhd. (HYMM), Shah Alam for motorcycle engine assembly of model 31D9. While conducting the research, a few methods had been justified for a better and accurate result. The time study method had being used to take the cycle time of the overall process in assemble the 31D9 model engine. Also, a few types of statistical process control chart had being used to analyse the data taken at HYMM. From the research that had been done, there was a station that the average cycle time is out-of-control which is the Station 16 with the average of 36.54 seconds, 5.46 seconds below the actual target. It is also being found that the longest cycle time was at Station 31 with 45.6 seconds, 3.66 seconds exceeding the actual target cycle time. The best improvement that can be suggested is reducing the length of the workstation in which will resulted in decreasing of cycle time that can increase the productivity and the efficiency.