Business Impact Analyst (BIA) session runner / Yee Chee Kang

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2013Description: xi, 67 p. : ill. ; 30 cm. + 1 CD-ROMISBN:
  • THE0001521(Local)
Subject(s): Dissertation note: Project paper (Bachelor of Computer Science (Software Engineering)) -- Universiti Malaysia Pahang – 2013 Abstract: BUSINESS IMPACT ANLYST (BIA) is a system that been essential in being a part of business continuity. As business continuity is management that have been take over the company when emergency situation like fire, flood and other incident take place. This process which called as business continuity plan haven taken to recover the company normal flow to avoid massive loss in the incident. BIA is a part of the business continuity plan which to indicate the critical level of the department in the company so that Business Continuity Management (BCM) know how to plan for the recover in the limited time. In reality, the BIA process is start when BCM coordinator have set the survey question and assign one staff of every different department in the company. The staff have being assigned is called Business Continuity Plan (BCP) coordinator unit. BCP coordinator unit will insert the required data into survey from.BCM coordinator will later analyst and know which the critical level department is. The system in this project will help BCM coordinator to be setting the template and question in the form for gaining the required data and also help BCP coordinator unit more easily to insert the data.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG HD49 .Y44 2013 rs Bc. (Browse shelf(Opens below)) 1 Not for loan 0000078949
Final Year Report Final Year Report UMPLIB GAMBANG CD 7653 | HD49 .Y44 2013 rs Bc. (Browse shelf(Opens below)) 1 Not for loan 0000078950

Project paper (Bachelor of Computer Science (Software Engineering)) -- Universiti Malaysia Pahang – 2013

Bibliography : p. 55

BUSINESS IMPACT ANLYST (BIA) is a system that been essential in being a part of business continuity. As business continuity is management that have been take over the company when emergency situation like fire, flood and other incident take place. This process which called as business continuity plan haven taken to recover the company normal flow to avoid massive loss in the incident. BIA is a part of the business continuity plan which to indicate the critical level of the department in the company so that Business Continuity Management (BCM) know how to plan for the recover in the limited time. In reality, the BIA process is start when BCM coordinator have set the survey question and assign one staff of every different department in the company. The staff have being assigned is called Business Continuity Plan (BCP) coordinator unit. BCP coordinator unit will insert the required data into survey from.BCM coordinator will later analyst and know which the critical level department is. The system in this project will help BCM coordinator to be setting the template and question in the form for gaining the required data and also help BCP coordinator unit more easily to insert the data.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us