Amazon cover image
Image from Amazon.com

Cost reduction and optimization for manufacturing and industrial companies / Joseph Berk

By: Material type: TextTextPublication details: Hoboken, N.J. : John Wiley ; c2010Description: viii, 258 p. : ill. ; 25 cmISBN:
  • 9780470609576
Subject(s):
Contents:
Organizing a cost-reduction program -- Defining headcount and controlling staff growth -- Developing and implementing time standards -- Measuring and using efficiency -- Assessing machine utilization -- Controlling overtime -- Making multiple shifts productive -- Finding and reducing lost time -- Using the learning curve to drive costs down -- Make-versus-buy determinations -- Inventory minimization -- Material utilization -- Minimizing supplier costs -- Supplier negotiation -- Supplier competition -- Workflow optimization -- Setup time reduction -- Material-handling improvements -- Scrap and rework reduction -- Work center cleanliness -- The design approach -- Requirements relaxation -- Tolerance relaxation -- Materials substitution -- Packaging -- General overhead expenses -- Travel -- Inspection -- Suggestion programs -- Measuring progress
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Open Shelf Open Shelf UMPLIB PEKAN TS165 .B47 2010 (Browse shelf(Opens below)) 1 Available 0000057750

Includes bibliographical references and index

Organizing a cost-reduction program -- Defining headcount and controlling staff growth -- Developing and implementing time standards -- Measuring and using efficiency -- Assessing machine utilization -- Controlling overtime -- Making multiple shifts productive -- Finding and reducing lost time -- Using the learning curve to drive costs down -- Make-versus-buy determinations -- Inventory minimization -- Material utilization -- Minimizing supplier costs -- Supplier negotiation -- Supplier competition -- Workflow optimization -- Setup time reduction -- Material-handling improvements -- Scrap and rework reduction -- Work center cleanliness -- The design approach -- Requirements relaxation -- Tolerance relaxation -- Materials substitution -- Packaging -- General overhead expenses -- Travel -- Inspection -- Suggestion programs -- Measuring progress

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us