Causes and effects of abuses in a feasibility study : a study in malaysian construction industry / Fong Woan Shiuan

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2013Description: xxi, 176 p. : ill. (some col.) ; 30 cm. + 1 CD-ROMISBN:
  • THE0001503(Local)
Subject(s): Dissertation note: Project Paper (Bachelors of Project Management with Honours) -- Universiti Malaysia Pahang – 2013 Abstract: Feasibility study is essential to be carried out at the early stage of project life cycle before entering into actual construction works. However, there are abuses of feasibility study occurred in construction industry in which this issue is seldom being given attention by the developers. Hence, there are four objectives in this research that aims to be achieved, which include to identify the causes of abuses of feasibility study in construction industry, to determine the effects of abuses of feasibility study in construction industry, to highlight the types of abuses occurred in feasibility study in construction industry, and to examine the relationship between the causes and effects of abuses of feasibility study in construction industry. The respondents of this research are developers who are the REHDA (Real Estate and Housing Developers‘ Association) members in Johor, Malaysia. The research data are collected by using postal questionnaires to 109 developers in Johor, Malaysia. Statistical analysis is used for data analysis in this research. For achieving first three research objectives, mean frequencies are used, whereas for achieving the fourth research objective, Pearson correlation is used. The results of data analysis showed that there are occurrences of abuses of feasibility study where types of abuses occurred in feasibility study, causes and effects of abuses of feasibility study in construction industry are determined and ranked according to their mean frequencies. In addition, the findings of this research also showed that there are positive and significant relationships between the causes and effects of abuses of feasibility study. As conclusion, the developers and project team should aware of the issue of abuses of feasibility study in construction industry. Besides that, the developers and project team should also alert to the causes of abuses of feasibility study in order to avoid from suffering of bearing the effects of abuses of feasibility study in construction industry.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG HD30.24 .F66 2013 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000090218
Final Year Report Final Year Report UMPLIB GAMBANG CD 8474 | HD30.24 .F66 2013 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000090219

Faculty of Engineering Technology

Project Paper (Bachelors of Project Management with Honours) -- Universiti Malaysia Pahang – 2013

Bibliography : p. 159-169

Feasibility study is essential to be carried out at the early stage of project life cycle before entering into actual construction works. However, there are abuses of feasibility study occurred in construction industry in which this issue is seldom being given attention by the developers. Hence, there are four objectives in this research that aims to be achieved, which include to identify the causes of abuses of feasibility study in construction industry, to determine the effects of abuses of feasibility study in construction industry, to highlight the types of abuses occurred in feasibility study in construction industry, and to examine the relationship between the causes and effects of abuses of feasibility study in construction industry. The respondents of this research are developers who are the REHDA (Real Estate and Housing Developers‘ Association) members in Johor, Malaysia. The research data are collected by using postal questionnaires to 109 developers in Johor, Malaysia. Statistical analysis is used for data analysis in this research. For achieving first three research objectives, mean frequencies are used, whereas for achieving the fourth research objective, Pearson correlation is used. The results of data analysis showed that there are occurrences of abuses of feasibility study where types of abuses occurred in feasibility study, causes and effects of abuses of feasibility study in construction industry are determined and ranked according to their mean frequencies. In addition, the findings of this research also showed that there are positive and significant relationships between the causes and effects of abuses of feasibility study. As conclusion, the developers and project team should aware of the issue of abuses of feasibility study in construction industry. Besides that, the developers and project team should also alert to the causes of abuses of feasibility study in order to avoid from suffering of bearing the effects of abuses of feasibility study in construction industry.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us