Conflict and dispute reduction mechanism of procurement method for construction industry in Malaysia / Nurul Athirah Mohd Nasir

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2015Description: xv, 95 p. : ill. (some col.) ; 30 cm. + 1 CD ROMISBN:
  • THE0000302(Local)
Subject(s): Online resources: Dissertation note: Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2015 Abstract: In resolving conflict and dispute for construction industry, various conflict management and dispute resolution methods have been and continue to be explored and develop, but the results are still unsatisfactory in views of tremendous increases of initiation of arbitration and litigation cases. This study examines the extent of innovative procurement method as conflict and dispute reduction mechanism compared to traditional procurement method. The study are divided into two part: Part 1 is concentrated on theory and literature survey, by using texts, journals, conference proceedings, dissertation and computer network information system; Part 2 is field study on issues related to conflict, dispute and procurement methods. One hundred and fifty postal questionnaire has been sent to key players in construction industry such as client, architect, consultant, contractor and quantity surveyor, to collect information, data and views related to conflict, dispute and procurement methods. The survey reveals that the most common used procurement methods, traditional procurement methods had the highest dispute rate comparing to other innovative procurement methods such as Design and Build, Construction Management and Partnering. The survey also reveals that the usage of innovative procurement methods is able to reduce the frequency of dispute occurrence for Malaysia construction industry. For creating a more harmony and peaceful environment in construction industry, appropriate action need to be taken to encourage the industry maximizing the usage of innovative procurement method
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG FKASA .A845 2015 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000104319
Final Year Report Final Year Report UMPLIB GAMBANG CD 9343 | FKASA .A845 2015 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000104320

Faculty of Civil Engineering and Earth Resources

Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2015

Bibliography : p. 88-91

In resolving conflict and dispute for construction industry, various conflict management and dispute resolution methods have been and continue to be explored and develop, but the results are still unsatisfactory in views of tremendous increases of initiation of arbitration and litigation cases. This study examines the extent of innovative procurement method as conflict and dispute reduction mechanism compared to traditional procurement method. The study are divided into two part: Part 1 is concentrated on theory and literature survey, by using texts, journals, conference proceedings, dissertation and computer network information system; Part 2 is field study on issues related to conflict, dispute and procurement methods. One hundred and fifty postal questionnaire has been sent to key players in construction industry such as client, architect, consultant, contractor and quantity surveyor, to collect information, data and views related to conflict, dispute and procurement methods. The survey reveals that the most common used procurement methods, traditional procurement methods had the highest dispute rate comparing to other innovative procurement methods such as Design and Build, Construction Management and Partnering. The survey also reveals that the usage of innovative procurement methods is able to reduce the frequency of dispute occurrence for Malaysia construction industry. For creating a more harmony and peaceful environment in construction industry, appropriate action need to be taken to encourage the industry maximizing the usage of innovative procurement method

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us