Standardized work approach toward kaizen event of the Front Hub MyVi D54T line at Sapura Machining Corporation Sdn Bhd [electronic resource] / Masturah Suliman Atoriy

By: Material type: Computer fileComputer filePublication details: Kuantan, Pahang : UMP, 2016Description: 1 computer disc : digital data ; 12 cmISBN:
  • THE0005100(Local)
Subject(s): Online resources: Dissertation note: Project Paper (Bachelor of Engineering in Manufacturing Engineering (Hons.)) -- Universiti Malaysia Pahang – 2016 Abstract: This thesis is deal with the one of the lean production system tool which is standardized work to eliminate the waste at the production line for continuous improvement. Standardized work is conducted to design, developing, and documentation and visualizes the proper and detail manufacturing process. This project is applied at the Front Hub MyVi D54T Line at Sapura Machining Corporation Sdn. Bhd. which is the vendor to Perusahaan Otomobil Kedua Sendirian Berhad (PERODUA) for front hub MyVi model. The productivity improvement is one of the major concerns in the manufacturing industry. Therefore, by providing this standardized work approach it can improve the efficiency and the performance of the manufacturing process. The project is following the PDCA (Plan, Do, Check, Action) continuous improvement cycle. At Plan stage is the identification and analyze the problem by using Total Quality Management (TQM) tools such as process flowchart, ishikawa diagram, FMEA and the 5 why analysis. At Do stage, the solution is developed and applied the pilot basis solution. The next stage is the Check stage which is for evaluate the result. Lastly, at Act stage is for implement the solution and planning ongoing monitoring on the solution. The improvement action of the standardized work kaizen can to increase the production consistency, process stability and the operator’s performances.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB PEKAN FKP .M37 2016 r Bc. | CD 10429 (Browse shelf(Opens below)) 1 Not for loan 0000115944

Faculty of Manufacturing Engineering

Theses Gred A

Project Paper (Bachelor of Engineering in Manufacturing Engineering (Hons.)) -- Universiti Malaysia Pahang – 2016

This thesis is deal with the one of the lean production system tool which is standardized work to eliminate the waste at the production line for continuous improvement. Standardized work is conducted to design, developing, and documentation and visualizes the proper and detail manufacturing process. This project is applied at the Front Hub MyVi D54T Line at Sapura Machining Corporation Sdn. Bhd. which is the vendor to Perusahaan Otomobil Kedua Sendirian Berhad (PERODUA) for front hub MyVi model. The productivity improvement is one of the major concerns in the manufacturing industry. Therefore, by providing this standardized work approach it can improve the efficiency and the performance of the manufacturing process. The project is following the PDCA (Plan, Do, Check, Action) continuous improvement cycle. At Plan stage is the identification and analyze the problem by using Total Quality Management (TQM) tools such as process flowchart, ishikawa diagram, FMEA and the 5 why analysis. At Do stage, the solution is developed and applied the pilot basis solution. The next stage is the Check stage which is for evaluate the result. Lastly, at Act stage is for implement the solution and planning ongoing monitoring on the solution. The improvement action of the standardized work kaizen can to increase the production consistency, process stability and the operator’s performances.

Item in PDF format

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us