Study of rainfall-runoff relationship using hydrological modelling system (HEC-HMS) for Lipis River Basin, Pahang / Wan Nurfatin Bt Wan Zainulabidin

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2016Description: xiii, 54 p. : ill. ; 30 cm + 1 CR-ROMISBN:
  • THE0000637(Local)
Subject(s): Online resources: Dissertation note: Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2016 Summary: In this study, Hydrologic Engineering Center – Hydrologic Modeling System (HEC-HMS) is used to determine the rainfall-runoff relationship of Lipis River, Pahang. HEC-HMS is software use in analyzing, planning, and simulating the process of rainfall and runoff. HEC-HMS 4.0 is used in this study to simulate discharge for Lipis River. This study uses rainfall data and stream flow data from January 2008 to December 2014. The data needed is from eleven rainfall stations and one stream flow station in Lipis River catchment area. The analysis result of the data is depends on the parameter used in HEC-HMS. Snyder Unit Hydrograph and SCS Unit Hydrograph are the method use in this study. The parameters include standard lag, peaking coefficient and lag time. The results of simulation can be generated in form of hydrograph, summary table, and time series table. Root Mean Square Error, RMSE is used to show the relationship of the observed and the simulated flow. If the RMSE value is lesser, it would indicate that the variables are positively linear related. During evaluation of model, the best value RMSE for Snyder UH method is 11.63m3/s while for SCS UH method is 13.148m3/s. It shows that the simulated models were fit with the observed data and proves that the HEC-HMS is suitable to predict and analyze rainfall-runoff relationship in Lipis River
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG FKASA .N876 2016 r Bc. (Browse shelf(Opens below)) 1 In Transit 0000115073
Final Year Report Final Year Report UMPLIB GAMBANG CD 10310 | FKASA .N876 2016 r Bc. (Browse shelf(Opens below)) 1 In Transit 0000115074

Faculty of Civil Engineering and Earth Resources

Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2016

Bibliography : p. 50-52

In this study, Hydrologic Engineering Center – Hydrologic Modeling System (HEC-HMS) is used to determine the rainfall-runoff relationship of Lipis River, Pahang. HEC-HMS is software use in analyzing, planning, and simulating the process of rainfall and runoff. HEC-HMS 4.0 is used in this study to simulate discharge for Lipis River. This study uses rainfall data and stream flow data from January 2008 to December 2014. The data needed is from eleven rainfall stations and one stream flow station in Lipis River catchment area. The analysis result of the data is depends on the parameter used in HEC-HMS. Snyder Unit Hydrograph and SCS Unit Hydrograph are the method use in this study. The parameters include standard lag, peaking coefficient and lag time. The results of simulation can be generated in form of hydrograph, summary table, and time series table. Root Mean Square Error, RMSE is used to show the relationship of the observed and the simulated flow. If the RMSE value is lesser, it would indicate that the variables are positively linear related. During evaluation of model, the best value RMSE for Snyder UH method is 11.63m3/s while for SCS UH method is 13.148m3/s. It shows that the simulated models were fit with the observed data and proves that the HEC-HMS is suitable to predict and analyze rainfall-runoff relationship in Lipis River

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us