Study on current practice of construction waste management system in Gambang, Kuantan, Pahang / Nur Fatin Aqilah Mat Zin

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2016Description: xv, 48 p. : ill. (some col.) ; 30 cm. + 1 CD-ROMISBN:
  • THE0000416(Local)
Subject(s): Online resources: Dissertation note: Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2016 Abstract: Malaysian construction industry had shown a robust growth nowadays and it gives positive impact to the nation. Construction waste becomes a global issue facing by practitioners and researchers around the world. Waste can affects success of construction project significantly. Moreover, the increasing generation of construction wastes has caused significant impacts to the environment and aroused growing public concern in the local community. One of the objectives for this research is to characterize and quantify of construction waste generated in Gambang construction area. The standard procedure method was followed to conduct this research. Base on the research objective, the result shown that the generated steel waste ranged from 0.65% - 14.62%. For generated timber waste ranged 0.45% - 10.86%, the plastic waste ranged from 0.09% - 7.26%, the paper waste ranged from 0.15% - 2.24%, and others generated waste ranged from 0.18% - 47.68%. The result shown that there was lot of waste generated that was not managed properly in construction site. Therefore, the proper waste minimization is needed to control the quantity of construction waste produced.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG FKASA .F386 2016 r Bc. (Browse shelf(Opens below)) 1 In Transit 0000114865
Final Year Report Final Year Report UMPLIB GAMBANG CD 10157 | FKASA .F386 2016 r Bc. (Browse shelf(Opens below)) 1 In Transit 0000114866

Faculty of Civil Engineering and Earth Resources

Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2016

Bibliography : p. 45-46

Malaysian construction industry had shown a robust growth nowadays and it gives positive impact to the nation. Construction waste becomes a global issue facing by practitioners and researchers around the world. Waste can affects success of construction project significantly. Moreover, the increasing generation of construction wastes has caused significant impacts to the environment and aroused growing public concern in the local community. One of the objectives for this research is to characterize and quantify of construction waste generated in Gambang construction area. The standard procedure method was followed to conduct this research. Base on the research objective, the result shown that the generated steel waste ranged from 0.65% - 14.62%. For generated timber waste ranged 0.45% - 10.86%, the plastic waste ranged from 0.09% - 7.26%, the paper waste ranged from 0.15% - 2.24%, and others generated waste ranged from 0.18% - 47.68%. The result shown that there was lot of waste generated that was not managed properly in construction site. Therefore, the proper waste minimization is needed to control the quantity of construction waste produced.