A study on the factor effecting project delay in the housing construction / Fatin Fazlinda Hamzah

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2015Description: xi, 65 p. : ill. (some col.) ; 30 cm. + 1 CD-ROMISBN:
  • THE0000037(Local)
Subject(s): Online resources: Dissertation note: Project Paper (Bachelor Degree (Hons) of Project Management) -- Universiti Malaysia Pahang – 2015 Abstract: This research is about the factor effecting project delay in housing construction. The purpose of this study is to identify factor delay in the housing project, to find out lack of fund to finance the project to completion effected on project delay, to investigate mistakes during construction and project management problem influence on project delay and to identify subcontractor delays effected project delay. Besides that, this study focuses on construction industries at Kuantan. . The technique to study this project is I’m use a method with distributes the questionnaire to people who related on this study. I distribute the questionnaire to 66 respondents on Kota Sas Company. After I’m distribute the questionnaire, I use the Statistical Package for the Social Sciences (SPSS) software to analyze the data to get the result. The specific implication from the finding reported in this study can be grouped into four category, compensation, need for achievement, equality theory and job performance.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG FIM .F38 2015 r Bc. (Browse shelf(Opens below)) 1 In Transit 0000115564
Final Year Report Final Year Report UMPLIB GAMBANG CD 10346 | FIM .F38 2015 r Bc. (Browse shelf(Opens below)) 1 In Transit 0000115565

Faculty of Industrial Management

Project Paper (Bachelor Degree (Hons) of Project Management) -- Universiti Malaysia Pahang – 2015

Bibliography : p. 47-57

This research is about the factor effecting project delay in housing construction. The purpose of this study is to identify factor delay in the housing project, to find out lack of fund to finance the project to completion effected on project delay, to investigate mistakes during construction and project management problem influence on project delay and to identify subcontractor delays effected project delay. Besides that, this study focuses on construction industries at Kuantan. . The technique to study this project is I’m use a method with distributes the questionnaire to people who related on this study. I distribute the questionnaire to 66 respondents on Kota Sas Company. After I’m distribute the questionnaire, I use the Statistical Package for the Social Sciences (SPSS) software to analyze the data to get the result. The specific implication from the finding reported in this study can be grouped into four category, compensation, need for achievement, equality theory and job performance.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us